Presentation is loading. Please wait.

Presentation is loading. Please wait.

WP4 - Strengthening the European Network on Earth System Modelling IS-ENES kick-off meeting – March 30-31, Paris Partners and general objectives CERFACS.

Similar presentations


Presentation on theme: "WP4 - Strengthening the European Network on Earth System Modelling IS-ENES kick-off meeting – March 30-31, Paris Partners and general objectives CERFACS."— Presentation transcript:

1 WP4 - Strengthening the European Network on Earth System Modelling IS-ENES kick-off meeting – March 30-31, Paris Partners and general objectives CERFACS (48), CNRS-IPSL (43), MF (3), MPG (22), MetOffice (6), SMHI (3), KNMI (3), CMCC (4)  In Europe, different ESMs are being developed by different climate research groups: ESMgroupatmosoceansea-icelandocean biogeo atmos chem ARPEGE- NEMO MF-CNRMARPEGENEMOGELATOISBA/ SURFEX C-ESMCMCCECHAMNEMOLIMSILVAPELAGOSnext COSMOSMPG, MPI, FMIECHAMMPI-OMJSBACHHAMOCCnext EC-EarthEC-Earth cons.IFSNEMOLIM HadGem3MetOfficeUMNEMOCICEJULESUKCA IPSLCMCNRS-IPSLLMDzNEMOLIMORCHIDEENEMOINCA Strengthening the interactions between those groups so they can share their scientific and technical experience Establishing a network of expertise around ESMs and their technical environment  Benefits will be leveraged by associated services provided through the v.E.R.C.

2 WP4 - Strengthening the European Network on Earth System Modelling IS-ENES kick-off meeting – March 30-31, Paris Tasks Task 0: Work package coordination Task 1: ESM documentation: mo 12: ESMs current documentation, incl. description of associated tools and specific “assembling guide” (User Guide). mo 18: ESM documentation following a subset of CIM metadata. mo 36: ESM revised documentation following the full CIM metadata. Task 2: Networking on common tools and components (OASIS, CDO, NEMO) mo 24: OASIS complete web site accessible via v.E.R.C. mo 24: CDO complete web site accessible via v.E.R.C. mo 24: web NEMO configurations database filled up by NEMO team mo 48: general coupled model assembling guide based on practical experience mo 48: web NEMO configurations database filled up by NEMO team and partners

3 WP4 - Strengthening the European Network on Earth System Modelling IS-ENES kick-off meeting – March 30-31, Paris First actions ESM documentation: Groups should get ready to provide documentation & User Guide for month 12 For CIM documentation (mo 18), close contact with METAFOR is needed. ARPEGE-NEMO as beta test for the CIM (MF-CNRM & CERFACS) Other WP4 partners could/should volunteer to be CIM beta testers Networking on OASIS OASIS User meeting, May 25-26, CERFACS, Toulouse registrations now open on IS-ENES web site! OASIS Dedicated User Support First Call for applicants in April-May 2009 OASIS web site Networking on CDO: CDO web site Networking on NEMO NEMO configurations database


Download ppt "WP4 - Strengthening the European Network on Earth System Modelling IS-ENES kick-off meeting – March 30-31, Paris Partners and general objectives CERFACS."

Similar presentations


Ads by Google