June 27th, 2005AB/CO/HT - Review of Activities for PS-SPS 2006 Startup SPS RF FARADAY CAGE Purpose, Scope and deliverables Javier Serrano.

Similar presentations


Presentation on theme: "June 27th, 2005AB/CO/HT - Review of Activities for PS-SPS 2006 Startup SPS RF FARADAY CAGE Purpose, Scope and deliverables Javier Serrano."— Presentation transcript:

1 June 27th, 2005AB/CO/HT - Review of Activities for PS-SPS 2006 Startup SPS RF FARADAY CAGE Purpose, Scope and deliverables Javier Serrano

2 June 27th, 2005AB/CO/HT - Review of Activities for PS-SPS 2006 Startup SPS RF FARADAY CAGE PURPOSE: To upgrade the existing TG3- based system with a new CTRV-based system, therefore allowing: –8 events/ms on the GMT cable. –FESA multi-cycling. –Usage of standard configuration and diagnostics software provided by AB-CO. –Documenting this important part of the timing system in the same central DB as the rest.

3 June 27th, 2005AB/CO/HT - Review of Activities for PS-SPS 2006 Startup SPS RF FARADAY CAGE SCOPE (1/2) –Every G64 crate is composed of TG3s and opto-fanout modules. –Take the G64 crates in groups of two and replace every group by a combination of one VME crate and one G64 crate (no TG3s, only for the fan-out modules). G64 Pulse stretchers Opto-fanouts G64 Front viewRear view Current G64 HW configuration

4 June 27th, 2005AB/CO/HT - Review of Activities for PS-SPS 2006 Startup SPS RF FARADAY CAGE SCOPE (2/2): work breakdown –Preparing 7 cable bundles (40 lemo 00 each). –Understanding the current installation in terms of SW and proposing a new configuration. –Procurement of 8 VME systems (crate + CPU), 70 CTRV cards, 35 fan-out cards plus miscellaneous material (fans, passe-cables,…). –Requesting extra Ethernet connections in the BA3 Faraday Cage. –Cabling in BA3 (6 VME crates) and BA2 (1 VME crate). –Software configuration and installation.

5 June 27th, 2005AB/CO/HT - Review of Activities for PS-SPS 2006 Startup SPS RF FARADAY CAGE DELIVERABLES DELIVERABLEDATEPEOPLE Cable bundles (7 * 40 lemo 00 cables) readyEnd Aug. 2005Barriere/Michelon CTTM (VME opto transition module) prototype ready Mid July 2005Nouchi/Michelon/Barriere CTTM series ready (50 modules)Mid Sept. 2005Nouchi BA3 and BA2 cabling (2 weeks) readyEnd Sept. 2005Barriere/Michelon Soft declaration of all timings (CTRV outputs) ready Mid Sept. 2005Kozsar 8 VME systems ready (Wiener crate + CPU)End Aug. 2005Surback 14 new Ethernet plugs ready (BA2 and BA3)End Aug. 2005AB-RF 70 CTRV cards readyEnd. Sept 2005Alvarez/Serrano/Leroy 70 CTRV and 35 CTTM installedMid Oct. 2005Kozsar/Serrano Complete BA2 and BA3 systems tested (1 month) Mid Nov. 2005AB-CO-HT and AB-RF