1 Program Manager Administrator
Florida Department of TRANSPORTATION Florida’s Turnpike Enterprise TENTATIVE Work Program Summary (FY 17-21) Paul Satchfield Program Manager Administrator December 10, 2015

2 Tentative Construction Fiscal Years 2016/17 – 2020/21
Florida Department of TRANSPORTATION Tentative Construction Fiscal Years 2016/17 – 2020/21

3 Florida Department of Transportation
Tentative Product Support Fiscal Years 2016/17 – 2020/21 Florida Department of Transportation

4 Florida Department of Transportation
FY 17 Consultant Acquisition Plan Ad # Project # BDI (Y / N) Description Project Type County PM Planned Ad Formal Ad Shortlist Date Final Selection Date 1 17810 ALTERNATIVE CORRIDOR EVALUATION (ACE) CONSULTANT ACQUISITION DESIGN STATEWIDE Bolan 12/7/2015 1/25/2016 3/15/2016 5/10/2016 2 17807 Y RESURFACE TPK MAINLINE IN ST. LUCIE COUNTY, MP STL Soldati 2/22/2016 4/8/2016 6/13/2016 3 17811 RESURFACE MAINLINE LAKE COUNTY MP TO (NB AND SB) AND TO (NB ONLY) LAKE Hinson 4/18/2016 5/2/2016 8/8/2016 4 17808 RESURFACE POLK PKWY, MP POLK 3/7/2016 4/4/2016 5/23/2016 7/18/2016 5 17801 PD&E MAINLINE WIDENING JUPITER TO FT PIERCE (MP 116 to 152) PD&E MARTIN/STL Zornek 5/30/2016 9/19/2016 6 17804 WIDEN SEMINOLE XWAY, SR434 TO N OF CR427 (MP ) (4TO8 LNS W EXP) PD&E/DESIGN SEMINOLE Ambare 6/20/2016 10/10/2016 7 17809 WIDEN TPK FROM SR710 (MP 106.1) TO MP 117 (4 TO 8 LNS) PALM BEACH TBD 6/6/2016 7/5/2016 8/22/2016 10/24/2016 8 17802 ORLANDO SOUTH ULTIMATE INTERCHANGE IMPROVEMENTS ORANGE Nagot 8/1/2016 11/21/2016 9 17812 RESURFACE MAINLINE MARTIN COUNTY (MP TO ) MARTIN 8/15/2016 10/3/2016 12/12/2016 10 17803 HEFT US1 EXIT RAMP MODIFICATION LOOP RAMP TO THE NW (MP 0) MIAMI-DADE 11 17806 WIDEN TPK- MINNEOLA INTCHG TO LEESBURG NORTH INTCHG (MP ) 7/25/2016 12/19/2016 Florida Department of Transportation

5 Florida Department of Transportation
Additional FY 17 Consultant Acquisitions District-Wide Design Services Continuing Services Contracts: Materials Testing and Geotechnical Services Landscape Design Design Build Request for Proposal (RFP) Development Miscellaneous Design Contracts: One advertisement, two (2) consultants selected Florida Department of Transportation

6 Florida Department of Transportation
TENTATIVE FY 18 Design (PH 32) Projects FPID AD # / CONTRACT # DESCRIPTION PH AET PHASE 8 TICKET SYSTEM (MP 88 -MP 236) 32 WIDEN TPK- LEESBURG NORTH INTCHG TO LAKE/SUMT ER C/L (MP ) WIDEN TPK FROM LAKE/ SUMTER C/L TO CR 468 INTCHG (MP ) WIDEN SEMINOLE EXPRESSWAY FROM CR427 TO RINEHART ROAD (MP 49 TO MP 54) RESURFACING MAINLINE ST. LUCIE COUNTY MP TO MP RESURFACING MAINLINE ORANGE COUNTY MP TO MP Amendment RESURFACE TPK MAINLINE IN PALM BEACH CNTY,MP & Misc Design HEFT BRIDGE PAINTING FOR SR 821 RAMP OVER US 1 & SR821 N/B OVER SR874 XXXXXX-X SPUR WIDENING HEFT (NW 41ST ST 114TH AVE - TURN LANE) Florida Department of Transportation

7 Florida Department of Transportation
Major Projects: South Florida – Broward & Miami-Dade SR 821 (HEFT) Widening with Express Lanes SR 836 to Miramar Toll Plaza (20 Miles) FYs 2017 & 2018 Sawgrass Expressway Widening with Express Lanes Sunrise to Powerline Rd (21.5 Miles) FYs 2019, 2020 & 2021 Mainline Widening with Express Lanes Atlantic Blvd to Wiles Rd (4 Miles) FY 2019 Sawgrass to Palm Beach County Line (2 Miles) FY 2021* *Continues as projects in Palm Beach County Florida Department of Transportation

8 TRANSPORTATION Florida Department of
Major Projects: South Florida – Palm Beach Mainline Widening with Express Lanes Palm Beach / Broward County Line to Lake Worth Road (17 Miles) FY 2018, 2020 & 2021* *Continuation of project in Broward County starting at Sawgrass Expressway 17 Miles of Express Lanes in Palm Beach County Florida Department of Transportation

9 TRANSPORTATION Florida Department of
Major Projects: Central Florida – Polk and Lake Mainline - Widening with Express Lanes Lake/Orange County Line to Minneola (5 Miles) FY 2021* Test Facility Florida Polytech Adjacent to Polk Parkway FY 2017 Polk Parkway Widening Dixie Highway to South of Pace Road (4 Miles) FY 2018 *Continues as project in Lake County 5 Miles of Express Lanes in Lake County Florida Department of Transportation

10 TRANSPORTATION Florida Department of
Major Projects: Central Florida – Orange and Osceola Mainline Widening with Express Lanes US 192/441 to Beachline (SR 528) (13 Miles) FY 2017 & 2019 SR 50/Clermont to Orange/Lake County Line (1 Mile) FY 2021* Mainline Interchanges: New Interchange at Sand Lake Road (MP 257) FY 2021 Direct Connect Ramps to I-4 Express Lanes (MP 259) FY 2018 *Continuation of project in Lake County starting at Minneola 14 Miles of Express Lanes in Orange and Osceola Counties Florida Department of Transportation

11 Florida Department of Transportation
Major Projects: PD&E and Design Mainline Widening with Express Lanes PD&E Re-evaluation - SR 710 to Jupiter, 11 miles in Palm Beach County, FY 2017 PD&E - Jupiter to Ft. Pierce, 36 miles in Martin County and St. Lucie County, FY 2017 PD&E - Orlando South Ultimate Interchange Improvement (SR 528 at Mainline), Orange County, FY 2017 Seminole Expressway Widening with Express Lanes PD&E and Design - SR 434 to CR 427, 5 Miles in Seminole County, FY 2017 SR 821 (HEFT) Design - Improve Interchange at Hainlin Mills Road (SW 216th St - MP 11), FY 2017 PD&E – Improve Interchange at US 1 (MP 0), FY 2017 Florida Department of Transportation

12 Florida Department of Transportation
Useful Links: Florida’s Turnpike Enterprise (FTE): FTE’s Consultant Acquisition Plan: FTE’s Work Program Utility: Florida Department of Transportation

13 TRANSPORTATION Paul Satchfield Florida Department of
FTE Program Management Administrator Florida Department of Transportation