Download presentation
Presentation is loading. Please wait.
Published byMarcus Hudson Modified over 8 years ago
1
Report from DataGrid Technical Board Massimo Sgaravatto INFN Padova
2
Project releases The high level synchronization of the different WPs is achieved through 3 project releases First release: project month 9 Second release: project month 21 Third release: project month 33 Each WP manager had to prepare a first description of the target functionalities for the releases: First draft: by October 20, 2000 Second release (after discussing inter-dependencies between the WPs): by November 17, 2000 This didn’t happen …
3
Project releases New proposed model: Use-cases could be the starting point for defining a list of requirement and Grid functionalities Applications (WP 8) define (short and long term) use-cases (by December 2000) ATF analyzes use-cases and defines Grid functionalities required in the releases (ATF workshop, mid of January) WPs receive from ATF the required Grid functionalities to implement In the meantime WPs are required to work on the evaluation of current technologies, on prototypes, etc…
4
Other info WP status reports Coordination with US Grid activities At the moment mainly at the management level (American) Grid Forum + European Grid Forum = Global Grid Forum (GGF) Foster and/or Kesselman and/or Tuecke (Globus team) in the ATF Search for the architect 7-8 applicants 3 interviewed by PMB
5
DataGrid weeks and GGF DataGrid weeks March 4, 2001, Amsterdam (with GGF1) July 1, 2001, UK November 16, 2001, Frascati (Roma) Global Grid Fora GGF1: March 4, 2001, Amsterdam GGF2: mid of July, Washington DC GFF3: October, Roma (?)
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.