Download presentation
Presentation is loading. Please wait.
Published byRandall Banks Modified over 9 years ago
1
ROCSAT-2 Current Status of ISUAL Project Jyh-Long Chern of NCKU Yukihiro Takahashi of Tohoku University Henry Heetderks of UCB February 28, 2002
2
ROCSAT-2 Current Status at UCB Development of the ISUAL Fabrication and Initial Testing of the Spectrophotometer ETU is complete System taken to Colorado mountain for testing with actual sprites Sprites successfully detected with expected sensitivity Cosmic ray contamination problem identified New PCB layout is complete and ETU and Flight boards have been etched New PCB is currently having parts installed Assembly of the ETU Sprite Imager is fully complete Camera system electronics with all operating modes is fully checked out All mechanical parts have been made for both ETU and flight units ETU is fully wired with all circuit boards, heaters, thermistors, motor, etc. Flight unit and NSPO ETU sub-assemblies are now being wired and assembled Optics assembly problems have been solved New tapers from Schott received and have very low defects Masks have been successfully deposited at UCB First flight intensifier/taper/mask/window/CCD assembly complete We will make a total of 4 assemblies and pick the best for flight
3
ROCSAT-2 Current Status at UCB Development of the ISUAL (Continued) Imager ETU has been fully assembled Drawings for revised Thermoelectric Cooler system are nearly complete Fabrication of new parts will begin week of 4 March Life testing is underway on ETU Filter wheel with flight motor Unit has operated for the equivalent of five years on orbit under vacuum at +45 deg C. Very little evidence wear on motor or gears We are now setting up to do a similar test at -40 deg C.
4
ROCSAT-2 Current Status at UCB Development of the ISUAL (Continued) AEP ETU Fabrication and Testing has made substantial progress Checkout of Mass Memory is complete DPU Checkout is mostly complete Interface to AP is checked out and working Interface to Mass Memory is checked out and working Interface to Analog Telemetry System is fully checked out Interface to DCM is fully checked out Interface to High Voltage control system checkout is in process Interface to Spectrophotometer (IDC) is not yet complete DCM has made great progress Hardware bugs on ETU board have been corrected with cuts and jumps and added components New board layout with circuit changes is being done at NCKU We believe we are very close to having BIOS software running in the DCM which will allow compression code to be uploaded from the DPU and run in the DCM PCB layout of the final board in the AEP, the Instrument Data Control (IDC) board is now almost complete We expect to have an etched board by 15 March
5
ROCSAT-2 Current Status at Tohoku Development of the AP AP ISD (AP interface testing model) and IGSE (Interface simulator for AP) were bought to UCB and successfully tested Tohoku has delivered AP document package to UCB (part of Milestone 2 package) "Milestone 1" has been confirmed and paid by UCB Schedule of environmental tests in Japan is under arrangement. It will be fixed in a week. Radiation tests for some ICs and PMTs were conducted with a total dose of 30 K rad. No problem was detected.
6
ROCSAT-2 Current Status at UCB IGSE Systems Status Hardware is complete and two systems are operational One is currently at UCB and the other is in France where it was used to support the successful testing of the ISUAL ISD We had a nasty bug develop in the IGSE which caused occasional loss of science data packets The problem appears to be due to a subtle bug in the operation of the National Instruments I/O boards which we are using to perform the simulated spacecraft interface We have made software modifications which include switching from C++ based drivers to Labview drivers This appears to have corrected the problem
7
ROCSAT-2 Current Status at NCKU Development of the DCM DCM (third version PCB) is used for software/BIOS/interface implementation testing Technically, the design of the DCM ETU will be finalized in this version Code implementation with assembly language is working on We are trying to catch the schedule Overall, NCKU’s DCM should be done within this year NCKU is scheduling to be at UCB in mid-December or early January for integration verification; after that ETU will be made at UCB (expected late January) and then flight model (expected February). NCKU will deliver Hardware testing note Software code book DCM PCB (hardware) Complete DCM ETU design
8
ROCSAT-2 Current Status at NCKU Development of GSE GSE Second version of Code book (GSE004) is complete Should be done by the end of this year Working on integration and testing with hardware After finishing NCKU will deliver Code book Testing Performance Evaluation Report
9
ROCSAT-2 Current Status at NCKU Optical Design and Testing Optical analysis on ISUAL CCD imager is complete Publication: Books can be downloaded from web site: http://www.phys.ncku.edu.tw/optics http://www.phys.ncku.edu.tw/optics More technical information including codes can be found over the web Currently, we have submitted three technical papers of optical analysis and got one paper accepted. More researches in the areas of optical analysis and blind image deconvoltuion are on-going Overall, ISUAL data will be used for more technical publications as a unique demonstration for novel data analysis algorithms as well as validating the test and evaluating the performance of the optical system (This is still very optimistic.)
10
ROCSAT-2 Current Status at NCKU Optical Design and Testing Workshop (on mid-December at NCKU campus) : Dr. Leo Gardner, Chairman of the Optical Design of the Optical Technology Division of OSA, is invited to talk about his experience on optical system design in the workshop: Design and Analysis Optical System More information can be found in web site http://www.phys.ncku.edu.tw/optics http://www.phys.ncku.edu.tw/optics In the next February, another tutorial course on optical design analysis with ASAP will be offered at NCKU campus. The lecturer is an experienced engineer from BRO. Optical Testing facilities Will be completed by the end of this year
11
ROCSAT-2 Current Status at NCKU Science Data Distribution Center Incorporating the CCSDS standard in data format Studying the telemetry commands for the ISUAL operation Reviewing CDF Skeleton Table for ISUAL data Evaluating data query functions and schemes for the ISUAL data Working on operational handbook (mission operation management) Simulation environment (parallel computing has been built)
12
ROCSAT-2 Current Status at NCKU Science team Ground observation Publications: Six papers are submitted for publication (expect two of them will be accepted) Meeting and international conference in the near future: Will attend this coming AGU meeting for paper presentation as well as the coordination meeting for the joint observation of the Sprites Activity: Ground observations have been made; More ground observation activities have been scheduled Simulation The simulation code is now under developing
Similar presentations