LMC Update - R2E Failures December 5 th 2012 (R2E) Mitigation Project: www.cern.ch/r2e LMC Update December 5 th 2012 R2E SEE Update M. Brugger on behalf.

Similar presentations


Presentation on theme: "LMC Update - R2E Failures December 5 th 2012 (R2E) Mitigation Project: www.cern.ch/r2e LMC Update December 5 th 2012 R2E SEE Update M. Brugger on behalf."— Presentation transcript:

1 LMC Update - R2E Failures December 5 th 2012 (R2E) Mitigation Project: www.cern.ch/r2e LMC Update December 5 th 2012 R2E SEE Update M. Brugger on behalf of the R2E Project Review follow-up: LinkLink !!! Many Thanks To Everybody !!!

2 LMC Update - R2E Failures December 5 th 2012 LMC Update - R2E Failures December 5 th 2012 2 Power-Converter Riddle AC/DC Problem understood Full Mitigation (LS1) ‘New’ Failures Vacuum PLC in P7 Increase in Rad-levels ‘New’ Critical Area Cryo Mecos in UX45 P4 10x more radiation in 2012 ‘Heaviest’ Radiation Test & Biggest ‘Burn’ H4Irrad last run (11 parallel User) ‘Spectacular’ final failure Introduction

3 LMC Update - R2E Failures December 5 th 2012 LMC Update - R2E Failures December 5 th 2012 3 Critical areas well within predictions Operational parameters are important Other areas not to be forgottenn e.g, UX45: 2011: 2.6x10 6 2012: almost 2x10 7 cm -2 Radiation Levels Predictions versus Observations (scaled to exp. lumi) 1.1x10 8 1.8x10 7 1.2x10 8 1.8x10 7 5.5x10 7 3.0x10 7 2.6x10 8 6.5x10 7 …and Today Decrease: TCL closed Increase: Tight Collimators

4 LMC Update - R2E Failures December 5 th 2012 LMC Update - R2E Failures December 5 th 2012 xMasBreak Actions very efficient Mecos AMB Events (P4/8) 4 © A. Suraci et al. TE-CRG-OA Better cleaning/control of the beam CV891/fb-1 2.3 1.9 0.7 4.3 3.2 - 1.5 ? Cryogenics TS2/3 Period interesting 2011 2012

5 LMC Update - R2E Failures December 5 th 2012 LMC Update - R2E Failures December 5 th 2012 Difference in the periods between Technical Stops? Clear correlation – Reason? (Vacuum [Scrubbing, Solenoids], Satellite Bunches, … ?) Interesting behaviour also in P4 5 Cryogenics

6 LMC Update - R2E Failures December 5 th 2012 LMC Update - R2E Failures December 5 th 2012 6 H4irrad tests confirmed expected sensitivity Cryogenics UPS FIRE No Beam (4h40) Beam without Target (7h40) Destructive SEU AMB Mecos Linde Type (P4/P8) S2M X X X X X X X 2X X X XXXX Vacon X No Beam (12h10) SEU Similar to P4 events 3h502h40 © B. Ivens, F. Morant, M. Pezzetti et al.

7 LMC Update - R2E Failures December 5 th 2012 LMC Update - R2E Failures December 5 th 2012 7 Locations: UJ56, UJ76, UX45, US85 Failure types: Mecos AMB Profibus communications Mitigations: AMB case (UX45, UX65, US85): Relocation under study [Mecos, S2M] Profibus: Relocation from UJs during LS1 Main Impact: Important contribution to R2E downtime Cryogenics DumpDump/TBCNo DumpNo Dump/TBC 4210 Status November 2012

8 LMC Update - R2E Failures December 5 th 2012 LMC Update - R2E Failures December 5 th 2012 8 QPS – SEE Related Failures DumpDump/TBCNo DumpNo Dump/TBC 312221 Locations: UJs, RRs, DS Failure types: Digital DAQ systems for nQPS 600A protection uFIP communication Mitigations: New DAQ system under design (FPGA) Firmware upgrades BricoFip (mid-term)/NanoFip (long-term) Main Impact: caused most of the R2E dumps Status November 2012

9 LMC Update - R2E Failures December 5 th 2012 LMC Update - R2E Failures December 5 th 2012 9 QPS – SEE Related Failures R2E consolidation 2012: 27 R2E trips during stable beam >LS1: with all foreseen measures in place: 1 © R. Denz, J. Steckert 2011: 3.5 dumps per fb -1 2012: 1.4 dumps per fb -1 1/3 of errors in UJ14/16/56

10 LMC Update - R2E Failures December 5 th 2012 LMC Update - R2E Failures December 5 th 2012 10 Locations: UJs, RRs, ARC Failure types (only confirmed ones kept in follow-up): 600A: Aux Power Supply [14] FGC [10] 120A failure [1] Mitigations: AC/DC power supply problem understood New FGClite design (on-going) Radiation tolerant power converters (started) Main Impact: Many destructive failures Power Converters DumpDump/TBCNo DumpNo Dump/ TBC 140110 Status November 2012

11 LMC Update - R2E Failures December 5 th 2012 LMC Update - R2E Failures December 5 th 2012 11 Failure Overview Dump ConfirmedDump TBCNo DumpNo Dump TBC 5710366 Destructive failures Dump ConfirmedDump TBCNo DumpNo Dump TBC 16140 Preliminary! Status November 2012 (all failures)

12 LMC Update - R2E Failures December 5 th 2012 LMC Update - R2E Failures December 5 th 2012 12 Total R2E related downtime ~250 (confirmed) - ~300h (incl. TBC) Mainly based on dump cases (others difficult to track) Downtime Analysis Preliminary! Status November 2012

13 LMC Update - R2E Failures December 5 th 2012 LMC Update - R2E Failures December 5 th 2012 What Changes After LS1 13 Main impacted systems – observed failure signatures: Equipment Upgrades New developments Relocation (UJs, US85, UX45 partly) Shielding (RRs) (Future) Commercial systems: Full relocation (except REs) No new installation in critical areas without radiation tests & developments >LS1 R2E related failures: Compatible with nominal/ultimate goal Enormous Effort during LS1

14 LMC Update - R2E Failures December 5 th 2012 LMC Update - R2E Failures December 5 th 2012 14 Tunnel Equipment: DS/ARC will get critical Long-term damage to be considered (cells 8-13) Impact of 25ns operation? Future upgrades/new installations RRs & Power Converters FGClite prototype in time and to be deployed Power-part R&D started & component tests on-going Areas to be watched UX45!, (UX25), UX65, UJ/UA23, UJ/UA87 (+REs) What Remains After LS1

15 LMC Update - R2E Failures December 5 th 2012 LMC Update - R2E Failures December 5 th 2012 15 Implementation has started General layout soon to be frozen Optimization (RP, CV, Tests) on-going Solutions for rail system investigated 1 st Planning exists DIRAC dismantling critical to be ready in time Aiming for 2014 Operation PS-EAirrad

16 LMC Update - R2E Failures December 5 th 2012 R2E: Past/Present/Future ~3 dumps per fb -1 2012 ~12 dumps per fb -1 2011 2011/12 xMasBreak ‘Early’ Relocation + Additional Shielding + Equipment Upgrades Several shielding campaigns prior 2011 + Relocations ‘on the fly’ + Equipment Upgrades < 0.5 dump per fb -1 R2E-Project aiming for … >LS1 (nominal -> ultimate) 2012 SEE Failure Analysis -Equipment relocations @ 4+ LHC Points (>100 Racks, >60 weeks of work) -Additional shielding -Critical system upgrades (QPS, FGC) 16 Status November 2012

17 LMC Update - R2E Failures December 5 th 2012 LMC Update - R2E Failures December 5 th 2012 17 2011, xMasBreak and previous actions very efficient 2012 Failures: Within Chamonix predictions … and the winner is: QPS + EPC (+Cryo) LS1 Mitigation Enormous relocation campaign (4+ Points) Remaining shielding Numerous system upgrades (QPS, EPC) R2E test facility in preparation Long-Term Damage & 25ns Operation -> impact on radiation levels in ARC/P4/P6 Conclusions

18 LMC Update - R2E Failures December 5 th 2012 LMC Update - R2E Failures December 5 th 2012 18 BACKUP

19 LMC Update - R2E Failures December 5 th 2012 UJ overview High Energy Hadron Fluence [  /cm -2 ] Area201120122011/fb -1 2012/fb -1 Comments UJ142.8*10 8 1.4*10 8 5.1x10 7 7.9x10 6 Physics deb. UJ162.2*10 8 1.1*10 8 4.2x10 7 6.2x10 6 Physics deb. UJ231.5*10 6 2.6*10 6 2.8x10 5 (*)1.5x10 5 (*)Injection UJ563.9*10 7 1.3*10 8 7.2x10 6 7.3x10 6 Physics deb. UJ766.4*10 6 6.0*10 7 1.2x10 6 (*)3.4x10 6 (*)Collimation UJ873.0*10 6 2.6*10 6 5.7x10 5 (*)1.5x10 5 (*)Injection P1: decrease by factor of 6x, thanks to additional shielding P7: increase due to tight collimator settings P2/8: reduction because of cleaner injections in the LHC (*) = ATLAS/CMS luminosity 19

20 LMC Update - R2E Failures December 5 th 2012 RR overview P1/5: decrease up to a factor of 2x (1.5-2x) due to TCL.4 closure P7: asymmetry L/R (also observed in operation) High Energy Hadron Fluence [  /cm -2 ] Area201120122011/fb -1 2012/fb -1 Comments RR137.2*10 6 1.4x10 7 1.4x10 6 7.9x10 5 Physics deb. RR178.4*10 6 2.0x10 7 1.6x10 6 1.1x10 6 Physics deb. RR531.2*10 7 2.0x10 7 2.3x10 6 1.1x10 6 Physics deb. RR571.0*10 7 2.0x10 7 1.9x10 6 1.1x10 6 Physics deb. RR737.7*10 6 4.2x10 7 1.5x10 6 (*)2.4x10 6 (*)Collimation RR771.1*10 7 2.1x10 7 2.1x10 6 (*)1.2x10 6 (*)Collimation (*) = ATLAS/CMS luminosity 20

21 LMC Update - R2E Failures December 5 th 2012 UX overview (4/6/8) P4: increase, beam-gas coupled with higher cumulative current in the machine How much can/will it go up in view of 25ns operation? High Energy Hadron Fluence [  /cm -2 ] Area201120122011/fb -1 2012/fb -1 Comments UX452.6*10 6 1.4x10 7 4.3x10 5 (*)8.2x10 5 (*)Beam-gas UX65N/A~1.x10 6 N/A Beam-gas UX852.1*10 8 2.8x10 8 1.7x10 8 (**)1.6x10 8 (**)Physics deb. US854.4*10 7 7.0x10 7 3.7x10 7 (**)4.1x10 7 (**)Physics deb. (*) = ATLAS/CMS luminosity (**) = LHCb luminosity 21

22 LMC Update - R2E Failures December 5 th 2012 LMC Update - R2E Failures December 5 th 2012 22 Leakage into DS getting important Cells 7-10: ~10Gy <Cell17: ~1Gy >Cell17: ~0.1Gy Currently relatively low vacuum activity ?How will this possibly change with 25ns? ARC & DS

23 LMC Update - R2E Failures December 5 th 2012 LMC Update - R2E Failures December 5 th 2012 23 Beam Loss Analysis (B1) Injection: ~7-8x10 16 Lost protons: Total: ~1x10 16 Experiments: ~3.4x10 15 Rest: ~6.6x10 15 Collimation: IR3: ~6x10 14 IR7: ~6x10 15

24 LMC Update - R2E Failures December 5 th 2012 LMC Update - R2E Failures December 5 th 2012 24 Beam Loss Analysis (B1) Injection: ~7-8x10 16 Lost protons: Total: ~1x10 16 Experiments: ~3.4x10 15 Rest: ~7.4x10 15 Collimation: IR3: ~7x10 14 IR7: ~6.7x10 15

25 LMC Update - R2E Failures December 5 th 2012 Cryo Actions Taken CV891: automatic reset implemented into PLC (action: switch off 24 Vdc) TT89x: modification of electronics card PLC: moved into better protected zone (P4-P6-P8 caverns) 24 Vdc: longer term, to be moved into a safer protected zone and better distribution of power consumption to be done. AMB (Magnetic bearing controllers): relocated partially in P8, (2 nd unit will be done at LS1, additional shielding foreseen; at P4, will be done during LS1

26 LMC Update - R2E Failures December 5 th 2012 LMC Update - R2E Failures December 5 th 2012 26 UJs: relocated DSP: To be replaced by rad-tol version + Firmware upgrade of the uC based boards oQPS, nQPS: Firmware upgrade for DAQ systems, dipole splice supervision boards, current lead protection systems (RR) Detectors with rad-tol DAQ in cells 8-12 (nDQQDL) IPQ/IPD/IT: Rad-tol DQQDI in all RRs (200 boards already produced) 600A: Rad-tol quench detection board (prototype developed) Optional: Special rad-tol splice superivsion and BricoFIP TM QPS R2E Upgrades

27 LMC Update - R2E Failures December 5 th 2012 LMC Update - R2E Failures December 5 th 2012 27 Vacuum DumpDump/TBCNo DumpNo Dump/ TBC 4300 Locations: UJ76 (all confirmed), Point 4 (TBC), Point6 (TBC) Failure types: Loss of the PLC control (soft) Power supply (destructive failures) Mitigations: Relocation from UJ76 Status November 2012

28 LMC Update - R2E Failures December 5 th 2012 LMC Update - R2E Failures December 5 th 2012 28 Failure Statistics

29 LMC Update - R2E Failures December 5 th 2012

30 LMC Update - R2E Failures December 5 th 2012

31 LMC Update - R2E Failures December 5 th 2012 LMC Update - R2E Failures December 5 th 2012

32 LMC Update - R2E Failures December 5 th 2012 LMC Update - R2E Failures December 5 th 2012

33 LMC Update - R2E Failures December 5 th 2012 LMC Update - R2E Failures December 5 th 2012

34 LMC Update - R2E Failures December 5 th 2012 LMC Update - R2E Failures December 5 th 2012