FOR APRIL 2013 THE REHABILITATION AND EXPANSION OF CENTRAL OGBIA WATER PROJECT,AT BAYELSA STATE SITE REPORT FOR NOVEMBER 2013
2
PROGRES PICTURES UPVC pipe installation
3
PROGRES PICTURES Construction of Inspection chamber on water pipeline
4
PROGRES PICTURES Admin Building 100% completed
5
PROGRES PICTURES Ground Tank 1-4 completed Elevated Tank completed
6
PROGRES PICTURES Ground Tanks completed with Concrete Ground Base
7
PROGRES PICTURES block work for the Gen House and generator platform completed.
8
PROGRES PICTURES 14 no of Filters on site
9
PROGRES PICTURES concrete blinding for aerator tank base, and floor slab of filtration treatment house
10
PROGRES PICTURES Cutting road for pipes and repairing of the surface
11
PROGRESS PICTURES Site General View
12
PROGRESS PICTURES Pipe and bends installation
13
PROGRES PICTURES Pipe, Sluice Valve Installation
14
PROGRESS PICTURES PRESSURE TEST BREAKING OF CONCRETE BEFORE LAYING OF PIPE WITHIN COMMUNITY
15
PROGRESS PICTURES Reinforcement and formwork for Emeyal booster station elevated tank Base