Download presentation
Presentation is loading. Please wait.
Published byBryan Hall Modified over 8 years ago
1
Vivek Gupta, Chair 802.21 WG Joint Opening Plenary IEEE 802.21 Session #14 M edia Independent Handover Services Jacksonville, Florida Vivek Gupta vivek.g.gupta@intel.com
2
Vivek Gupta, Chair 802.21 WG2 ChairVivek Gupta vivek.g.gupta@intel.com Vice-ChairMichael Williams Michael.G.Williams@nokia.com SecretaryXiaoyu Liu xiaoyu.liu@samsung.com WG Officers
3
Vivek Gupta, Chair 802.21 WG3 IEEE 802.21 Meeting Server Details External website: http://www.ieee802.org/21http://www.ieee802.org/21 On site meeting website: http://802Server/21http://802Server/21 On site web portal: http://ieee802.facetoface- events.com/plenary/attendee http://ieee802.facetoface- events.com/plenary/attendee
4
Vivek Gupta, Chair 802.21 WG4 Attendance No electronic attendance –Manual attendance with signup sheets circulated during meetings Voting Members have 802.21 indication on their badges –For any VM badge problems, please send email to Michael Williams, Vice-Chair with a copy of the email to the Chair
5
Vivek Gupta, Chair 802.21 WG5 Session Time and Location Location: Hyatt Regency, Jacksonville, USA –Grand Ballroom 6 for all times unless otherwise noted Time: –Monday: Afternoon: 1.30 pm – 6.00 pm (2 meeting slots: PM1, PM2) –Tuesday to Thursday: Morning: 8.00 am – 12.00 pm (2 meeting slots/morning: AM1, AM2) Afternoon: 1.00 pm – 6.00 pm (2 meeting slots/evening: PM1, PM2) Total of 14 meeting slots –To get attendance credit towards voting membership for this Plenary, one would require 75% attendance in 11 meeting slots
6
Vivek Gupta, Chair 802.21 WG6 802.21 WG Charter IEEE 802.21 is developing standards to enable handover and interoperability between heterogeneous networks including both 802 and non-802 networks
7
Vivek Gupta, Chair 802.21 WG7 Summary of Completed Work Requirements, Call for Proposals Completed Draft Specification (P802-21-D00.01) confirmed Letter Ballot #1 Completed –Return Ratio: 81%, Approval Ratio: 26% –1323 Comments Received Activities with other SDOs –802.16: Req. sent & solution incorporated in 802.16g –802.11: Req. sent and proposal being discussed in TGu –3GPP: Requirements Accepted at 3GPP-SA2#52 for IS
8
Vivek Gupta, Chair 802.21 WG8 Work In Progress Letter Ballot #1 Comment resolution –1323 Comments Interaction with other 802 groups and external SDOs –Requirements for L3 solution for IETF –Proposal update in 802.11u –Requirements and proposals for 3GPP
9
Vivek Gupta, Chair 802.21 WG9 Aims for the Session WG Secretary and Editor Appointment Letter Ballot #1 Comment Resolution –Technical –Editorial Interaction with other 802 groups and external SDOs –L3 Transport requirements to IETF –3GPP/3GPP2 next steps discussion
10
Vivek Gupta, Chair 802.21 WG10 Future Sessions Plenary: July 16 th – 21 st, Manchester Grand Hyatt –San Diego, CA, USA. Co-located with all 802 groups Interim: September 17 th – 22 nd –Melbourne, Victoria, Australia. Meeting co-located with 802.11/15/18/19/20/22 Plenary: Nov 12 th – 17 th, Hyatt Regency –Dallas, TX, USA. Co-located with all 802 groups Interim: Jan 14 th – 19 th –London, UK. Meeting co-located with 802.11/15/18/19/20/22
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.