INCIDENT MANAGEMENT SYSTEM SETS & REPS DEPLOYMENT.

Similar presentations


Presentation on theme: "INCIDENT MANAGEMENT SYSTEM SETS & REPS DEPLOYMENT."— Presentation transcript:

1 INCIDENT MANAGEMENT SYSTEM SETS & REPS DEPLOYMENT

2 INCIDENT MANAGEMENT SYSTEM The IC is responsible for the initial & ongoing deployment of the resources REQUIRED to support all phases of Incident operations.

3 INCIDENT MANAGEMENT SYSTEM IC’s must maintain an awareness of the standard TFS response levels, apparatus capabilities and available specialty apparatus. (know your resources)

4 INCIDENT MANAGEMENT SYSTEM The Deployment process starts with Communications dispatching the appropriate level of resource for the problem described by the caller (our customer).

5 INCIDENT MANAGEMENT SYSTEM The process continues with the 1 st arriving IC performing an initial Size-Up of Incident conditions to determine what resources are required to stabilize the Incident. (what do you need?)

6 INCIDENT MANAGEMENT SYSTEM The Deployment of resources requires the IC to: Request Assign Track Rotate Rehab Clear crews as the Incident downgrades

7 INCIDENT MANAGEMENT SYSTEM One of the most critical pieces of the Deployment process is for additional responding Apparatus to report to a Base Sector and wait to be assigned by the IC. (Controlled arrival)

8 INCIDENT MANAGEMENT SYSTEM On Scene Crew Status: Unassigned  Staged  Rehabbing  Rehabbed / Ready to go On Deck  Relief Cycle  Reinforce  RIT Assigned  Initial crews  To a sector

9 INCIDENT MANAGEMENT SYSTEM Teams being assigned at all incidents must operate within the TFS Incident Management System to ensure accountability and an effective command structure. *NO Freelancing

10 INCIDENT MANAGEMENT SYSTEM Command needs to have a realistic awareness of the number of required tasks, their priority, and the time needed to complete those tasks prior to assigning crews to the hazard area.

11 INCIDENT MANAGEMENT SYSTEM Once assigning units to the Fire Ground, the IC must track, account for, and manage the Work / Rest cycle of all crews. (FF Safety/Air Management)

12 INCIDENT MANAGEMENT SYSTEM The IC’s level of organizational support needs to match the deployment of Incident resources: (span of control)  Sectors  Command Team  Branches

13 INCIDENT MANAGEMENT SYSTEM Sets & Reps Based on the following scenarios: Estimate the amount of resources (alarm level) that will be required to stabilize the Incident The specific tasks that will be required to stabilize the Incident How long it will take to get companies to where the work needs to be done The tactical reserve needed to conduct safe operations

14 INCIDENT MANAGEMENT SYSTEM Apparatus Positioning? Strategy – Offensive / Defensive / Marginal? Alarm Level – based on 360 size up? Second Hose line / Location? Ventilation / When / Where / Type? Primary Life Hazards? Construction considerations? Fire Spread Considerations / Interior / Exterior? Collapse Potential? Worst case scenario? First Hose line / Size / Entry Point / Destination?

15 INCIDENT MANAGEMENT SYSTEM Apparatus Positioning? Strategy – Offensive / Defensive / Marginal? Alarm Level – based on 360 size up? Primary Life Hazards? Fire Spread Considerations / Interior / Exterior? Collapse Potential? Worst case scenario? Second Hose line / Location? Ventilation / When / Where / Type? Construction considerations? First Hose line / Size / Entry Point / Destination?

16 INCIDENT MANAGEMENT SYSTEM Apparatus Positioning? Strategy – Offensive / Defensive / Marginal? Alarm Level – based on 360 size up? Second Hose line / Location? Ventilation / When / Where / Type? Primary Life Hazards? Construction considerations? Fire Spread Considerations / Interior / Exterior? Collapse Potential? Worst case scenario? First Hose line / Size / Entry Point / Destination?

17 INCIDENT MANAGEMENT SYSTEM Apparatus Positioning? Strategy – Offensive / Defensive / Marginal? Alarm Level – based on 360 size up? Second Hose line / Location? Ventilation / When / Where / Type? Primary Life Hazards? Construction considerations? Fire Spread Considerations / Interior / Exterior? Collapse Potential? Worst case scenario? First Hose line / Size / Entry Point / Destination?

18 INCIDENT MANAGEMENT SYSTEM Apparatus Positioning / Crew Deployment (3 vs 4 FF’s) / Equipment required? Strategy – Offensive / Defensive / Marginal? Alarm Level? First Hose line / Size / Destination? Second Hose line / Size / Location? Ventilation / When / Where / Type? Primary Life Hazards / Stairwells / Upper Floors? Elevator considerations? Fire Spread Considerations / Interior / Exterior? IMS Considerations / Lobby Control / Entry / RIT / Account./ Sectoring / Air Management / Rehab? Worst case scenario?

19 INCIDENT MANAGEMENT SYSTEM Apparatus Positioning / Crew Deployment (3 vs 4 FF’s) / Equipment required? Strategy – Offensive / Defensive / Marginal? Alarm Level? First Hose line / Size / Destination? Second Hose line / Size / Location? Ventilation / When / Where / Type? Elevator considerations? Fire Spread Considerations / Interior / Exterior? IMS Considerations / Lobby Control / Entry / RIT / Account./ Sectoring / Air Management / Rehab? Worst case scenario? Primary Life Hazards / Stairwells / Upper Floors?

20 INCIDENT MANAGEMENT SYSTEM Apparatus Positioning? Strategy – Offensive / Defensive / Marginal? Alarm Level – based on 360 size up? First Hose line / Size / Destination? Second Hose line / Size / Location? Ventilation / When / Where / Type? Primary Life Hazards? Construction considerations—lightweight truss? Fire Spread Considerations / Interior / Exterior? Collapse Potential? Worst case scenario? Firefighter hazards?

21 INCIDENT MANAGEMENT SYSTEM Apparatus Positioning? Strategy – Offensive / Defensive / Marginal? Alarm Level – based on 360 size up? First Hose line / Size / Destination? Second Hose line / Size / Location? Ventilation / When / Where / Type? Primary Life Hazards? Construction considerations—lightweight truss? Fire Spread Considerations / Interior / Exterior? Collapse Potential? Worst case scenario? Firefighter hazards?

22 INCIDENT MANAGEMENT SYSTEM Strategy – Offensive / Defensive / Marginal? Alarm Level ? Other agencies? First Hose line / Size / Destination? Second Hose line / Location? Ventilation / When / Where / Type? Primary Life Hazards? The public / Firefighters? Extinguishment considerations? Fire Spread Considerations? Explosion Potential? Electrocution potential? Worst case scenario? Reference SOG G-HYDR

23 INCIDENT MANAGEMENT SYSTEM Strategy – Offensive / Defensive / Marginal? Alarm Level ? Other agencies? First Hose line / Size / Destination? Second Hose line / Location? Ventilation / When / Where / Type? Primary Life Hazards? The public / Firefighters? Extinguishment considerations? Fire Spread Considerations? Explosion Potential? Electrocution potential? Worst case scenario? Reference SOG G-HYDR

24 INCIDENT MANAGEMENT SYSTEM Apparatus Positioning? Strategy – Offensive / Defensive / Marginal? Alarm Level – based on 360 size up? First Hose line / Size / Destination? Second Hose line / Location? Ventilation / When / Where / Type? Primary Life Hazards? Construction considerations? Fire Spread Considerations / Interior / Exterior? Collapse Potential? Worst case scenario?

25 INCIDENT MANAGEMENT SYSTEM Apparatus Positioning? Strategy – Offensive / Defensive / Marginal? Alarm Level – based on 360 size up? First Hose line / Size / Destination? Second Hose line / Location? Ventilation / When / Where / Type? Primary Life Hazards? Construction considerations? Fire Spread Considerations / Interior / Exterior? Collapse Potential? Worst case scenario?

26 INCIDENT MANAGEMENT SYSTEM Apparatus Positioning? Strategy – Offensive / Defensive / Marginal? Alarm Level – Specialty Apparatus / Agencies? First Hose line / Size / Destination? Second Hose line / Location? Ventilation / When / Where / Type? Primary Life Hazards? Construction considerations? Fire Spread Considerations / Interior / Exterior? Explosion Potential? Worst case scenario? Reference SOG G-HOPP

27 INCIDENT MANAGEMENT SYSTEM Apparatus Positioning? Strategy – Offensive / Defensive / Marginal? Alarm Level / Specialty Apparatus / Agencies / Recon? First Hose line / Size / Destination? Second Hose line / Location? Ventilation / When / Where / Type? Primary Life Hazards? Explosive considerations? Fire Spread Considerations / Interior / Exterior? Collapse Potential? Worst case scenario? Reference SOG G-HAZB / HAZC

28 INCIDENT MANAGEMENT SYSTEM Apparatus Positioning? Strategy? Alarm Level? First Hose line / Size? Second Hose line / Location? Ventilation / When / Where / Type? Primary Life Hazards? Construction considerations? Fire / Smoke Spread Considerations / Interior / Exterior? Worst case scenario?

29 INCIDENT MANAGEMENT SYSTEM Command Mode? Strategy – Offensive / Defensive / Marginal? Alarm Level – based on 360 size up? First Hose line / Size / Destination? Second Hose line / Location? Ventilation / When / Where / Type? Primary Life Hazards? Construction considerations? Fire Spread Considerations / Interior / Exterior? Collapse Potential? Worst case scenario?

30 INCIDENT MANAGEMENT SYSTEM Apparatus Positioning? Strategy – Offensive / Defensive / Marginal? Alarm Level – based on 360 size up? First Hose line / Size / Destination? Second Hose line / Size / Location? Ventilation / When / Where / Type? Primary Life Hazards? Construction considerations—lightweight truss? Fire Spread Considerations / Interior / Exterior? Collapse Potential? Worst case scenario? Firefighter hazards?

31 INCIDENT MANAGEMENT SYSTEM Strategy – Offensive / Defensive / Marginal? Alarm Level / Specialty Apparatus / Agencies / Recon? First Hose line / Size / Destination? Second Hose line / Location? Ventilation / When / Where / Type? Primary Life Hazards? Explosive considerations? Fire Spread Considerations / Interior / Exterior? Collapse Potential? Worst case scenario? Reference SOG G-HAZB / HAZC

32 INCIDENT MANAGEMENT SYSTEM Apparatus Positioning? Strategy – Offensive / Defensive / Marginal? Alarm Level – based on 360 size up? First Hose line / Size / Destination? Second Hose line / Location? Ventilation / When / Where / Type? Primary Life Hazards? Construction considerations? Fire Spread Considerations / Interior / Exterior? Collapse Potential? Worst case scenario?

33 INCIDENT MANAGEMENT SYSTEM End of Show Thank you End of Show Thank you