Download presentation
Presentation is loading. Please wait.
Published byAdelia Short Modified over 9 years ago
1
17 december 2003 Gert-Jan Nooren 1
2
17 december 2003 Gert-Jan Nooren 2 ITS SSD in 2003
3
17 december 2003 Gert-Jan Nooren 3 SSD modules on ladder
4
17 december 2003 Gert-Jan Nooren 4 start of module production assembly robot for ladders control, read-out, DAQ beam test highlights in 2003
5
17 december 2003 Gert-Jan Nooren 5 Design parameters ‘on the edge’ -> highly sensitive to process parameters -> MPW yield 50, 98, 8 % Improved process control -> Engineering run yield 85 - 95 % Thinning down to 150µm for better radiation length in progress HAL25 status
6
17 december 2003 Gert-Jan Nooren 6 components of the modules 1.HAL25-chip TAB-bonded on its Al chipcable (6 chips/hybrid) 3. sensor (768 strips/side) 2. Hybrids (2 hybrids/mod)
7
17 december 2003 Gert-Jan Nooren 7 ALICE SSD Module
8
17 december 20038 Module scanner laser 1.06 m wavelength positioning ~1.5 m spot diameter < 20 m Aleksey Sokolov
9
17 december 2003 Gert-Jan Nooren 9 Readout of the modules P-Hybrid N-Hybrid control ALCAPONE EndCap ALABUF analog out Sensor V bias FEROM
10
17 december 2003 Gert-Jan Nooren 10 Assembly robot Pick & place robot for modules Automatic positioning to a few micrometers Acceptance test 19 December
11
17 december 2003 Gert-Jan Nooren 11 September 2003 beam test Prototype 4-module EndCap
12
17 december 2003 Gert-Jan Nooren 12 September 2003 beam test 5 module telescope
13
17 december 2003 Gert-Jan Nooren 13 September 2003 beam tests S/N for 4 modules N P N P N P N P Very preliminary - provided by Trieste team Module SN0002Module SN0003Module HN0001Module HN0002 Canberra sensorITC sensor
14
17 december 2003 Gert-Jan Nooren 14 Beam tests Integration in real Cern environment: read-out chain proven up to ADC Sensor quality problem revealed: Canberra takes action ITS = SPD + SDD + SSD beamtest end 2004 Status and plans
15
17 december 2003 Gert-Jan Nooren 15 Beam tests Integration in real Cern environment: read-out chain proven up to ADC Sensor quality problem revealed: Canberra takes action ITS = SPD + SDD + SSD beamtest end 2004 Module production Helsinki is bonding chips at production speed 2 + 7 modules produced, yield and speed ‘unknown’ Testing infrastructure for chips and hybrids fully operational Strasbourg and Trieste (MIPOT) starting in Q1 Status and plans
16
17 december 2003 Gert-Jan Nooren 16 Beam tests Integration in real Cern environment: read-out chain proven up to ADC Sensor quality problem revealed: Canberra takes action ITS = SPD + SDD + SSD beamtest end 2004 Module production Helsinki is bonding chips at production speed 2 + 7 modules produced, yield and speed ‘unknown’ Testing infrastructure for chips and hybrids fully operational Strasbourg and Trieste (MIPOT) starting in Q1 Read-out EndCap ready for mass production FEROM design ready, first prototype Q2 Patchpanels and cables layout almost frozen Status and plans
17
17 december 2003 Gert-Jan Nooren 17 Beam tests Integration in real Cern environment: read-out chain proven up to ADC Sensor quality problem revealed: Canberra takes action ITS = SPD + SDD + SSD beamtest end 2005 Module production Helsinki is bonding chips at production speed 2 + 7 modules produced, yield and speed ‘unknown’ Testing infrastructure for chips and hybrids fully operational Strasbourg and Trieste (MIPOT) starting in Q1 Read-out EndCap ready for mass production FEROM design ready, first prototype Q2 Patchpanels and cables layout almost frozen Assembly First ladder Q1/Q2 Module testing with laser set-up Status and plans
18
17 december 2003 Gert-Jan Nooren 18 June 2003 beam tests module SN0003 Charge matching N P
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.