Juan de Fuca Cable Project Presented by: Sea Breeze April 25, 2006
2
Project Location Proposed length on B.C. side:12 km Proposed length on WA side: 3 km Length at sea: 34 km Victoria to Port Angeles: 49 km
3
Process involves: Environmental studies Evaluation of study results Consultation with stakeholders Decision based on factors including: Minimizing environmental impact Minimizing disruption Cost Route Selection
4
Process involves: Working with the Island Corridor Foundation Installation of cable in railway bed Opportunities to collaborate with the ICF and the Town of View Royal
5
Installation Process involves: 1m wide trench Direct-burying cables in trench Covering/backfilling trench
6
Project Benefits Reliable power supply for VI No fluctuating magnetic fields Help meet Vancouver Island’s growing electricity demands Minimal environmental impact Gotland HVDC Light® cables. Photo courtesy of ABB.
7
Timeline NEB hearing will begin May 1. NEB decision expected in early July - based on whether the project is in best interests of public Physical construction phase scheduled to begin January 2007, completed in 2008
8
Thank You www.jdfcable.com