Deep Underground Science and Engineering Laboratory at Homestake1 Richard DiGennaro, LBNL DUSEL Project Manager 20 June 2008 Facility Planning for DUSEL.

Similar presentations


Presentation on theme: "Deep Underground Science and Engineering Laboratory at Homestake1 Richard DiGennaro, LBNL DUSEL Project Manager 20 June 2008 Facility Planning for DUSEL."— Presentation transcript:

1 Deep Underground Science and Engineering Laboratory at Homestake1 Richard DiGennaro, LBNL DUSEL Project Manager 20 June 2008 Facility Planning for DUSEL Plans for Preliminary Geotechnical Studies

2 2 4850 Level (+118) Conceptual Layout Neutrino Detectors Lab Modules Ross Shaft Yates Shaft Davis Cavern Existing Drifts New Drifts Scale: ~1 km (3000 ft.)

3 Deep Underground Science and Engineering Laboratory at Homestake3 Preliminary Feasibility Studies have been done for Excavation and Ground Support for Typical Lab Modules Lab Module Ramped Excavation Sequence Preliminary Geotechnical Analyses were done to support the site selection and identify preliminary requirements for excavation and ground support requirements. Detailed site investigation studies will evaluate specific conditions at proposed locations for development. 4850 Level Map CDR

4 Deep Underground Science and Engineering Laboratory at Homestake4 Geotechnical Studies at Homestake Homestake DUSEL Geotechnical Advisory Committee Ziggy Hladysz, SDSMT ( Chair ) Chris Laughton, FNAL Bill Roggenthen, SDSMT Bill Pariseau, Univ. of Utah Steve Glaser, U.C. Berkeley Herb Wang, Univ. of Wisconsin Joe Wang, LBNL

5 Deep Underground Science and Engineering Laboratory at Homestake5 Request for Proposals for Geotechnical Engineering Services Proposal are DUE June 20, 2008 Anticipated Start Date for Underground Work ~ Sept. 2008 Objectives for Preliminary Design of Lab Modules at 4850 Level and 300 Level 1)to provide a better understanding of the rock properties 2)to characterize the rock conditions in the areas of proposed future development 3)to establish parameters and recommendations for the rock excavation design work to follow in the next phase of work for DUSEL 4)to provide geotechnical data that can be used to evaluate potential impacts that phased construction will have on the adjacent rock. Scope of Work to be undertaken at the 4850 Level Core Drilling Laboratory Tests In-Situ Tests Site Mapping

6 Deep Underground Science and Engineering Laboratory at Homestake6 4850 Level - Existing Infrastructure

7 Deep Underground Science and Engineering Laboratory at Homestake7 4850 Level Geology

8 Deep Underground Science and Engineering Laboratory at Homestake8 4850 Level Drilling Plan