Gas Roads & GTE Colin Hamilton (European Policy) 2 nd July 2009
2
2 Gas Roads & GTE Transparency and the 3 rd Package Commission’s proposed Annex GTE to ENTSOG Gas Roads – the “Transparency Platform”
3
3 What is the 3 rd Package? Intention is to help further facilitate fully liberalised European gas and electricity markets and force the current wide regional differences to converge towards a single market. Transmission Network Unbundling is a key element - three models considered Also, the formation of formal European Transporter bodies, ENTSO-G and ENTSO-E The creation of a formal body of regulators, known as ACER Both will be involved in the development of European Network Codes 3 rd Package approved 25 th June 2009 Published in Official Journal - August 2009 Enters into force 20 days later Documents found via – http://www.consilium.europa.eu/uedocs/cms_data/docs/pressdata/en/misc/108740.pdf http://www.consilium.europa.eu/uedocs/cms_data/docs/pressdata/en/misc/108740.pdf
4
4 Transparency and the 3 rd Package 2 nd Package (EC 1775/2005) focussed on access Publication of technical, sold and available capacity Transparent, objective and non-discriminatory tariffs 3 rd Package requires publication of supply/demand information Ex-ante & ex-post based on nominations, forecasts and realised flows TSOs developing common understanding of what should be published to meet new obligations National Grid doing “gap analysis” – may result in UNC Mods being raised
5
5 Commission's Proposed Annex Proposed amendment to Annex 3 (Transparency) to Regulation Aim to put through comitology (September 2009) Greatly extends transparency requirements – “Relevant points” extended to virtually every point – Gas quality parameters and pressure requirements for each relevant point – Daily linepack forecasts – Historic data published – extended to 5 years
6
6 GTE to ENTSOG Gas Transmission Europe (GTE) part of association of gas infrastructure operators (GIE, Gas Infrastructure Europe) GIE has 3 columns: transmission, storage and LNG Under 3 rd Package GTE will become the European Network of Transport System Operators (Gas), ENTSOG Link = http://www.gie.eu.com/http://www.gie.eu.com/
7
7 GTE to ENTSOG Duties of ENTSOG include: Common network operation tools and research plans 10-year network development plan Annual work programme Annual report Annual summer and winter supply outlooks Technical and market codes (European Network Codes) – Will involve stakeholder consultation – May result in UNC Mod proposals
8
8 Gas Roads – the “Transparency Platform” Consultation with stakeholders identified need for gas transport information in single place GTE+ Transparency platform was proposed solution Aligns with current EU Regulation 1775/2005 and anticipates 3 rd package Publication of technical information necessary for Users to gain effective network access User-friendly standardized manner
9
9 Gas Roads – the “Transparency Platform” Phase 1 launched November 2008 http://www.gas-roads.eu http://www.gas-roads.eu Capacity & Tariff information Capacity “route planner” Information from 27 TSOs Phase 2 from Q2 2009 onwards Nominations, allocations Balancing Interruption