Presentation is loading. Please wait.

Presentation is loading. Please wait.

M. Ono NSTX FWP 2014 Budget Planning Meeting Apr. 15, 2012 Chapter 10. NSTX-U Facility Status and Proposed Upgrades Text, figures – mostly there except.

Similar presentations


Presentation on theme: "M. Ono NSTX FWP 2014 Budget Planning Meeting Apr. 15, 2012 Chapter 10. NSTX-U Facility Status and Proposed Upgrades Text, figures – mostly there except."— Presentation transcript:

1 M. Ono NSTX FWP 2014 Budget Planning Meeting Apr. 15, 2012 Chapter 10. NSTX-U Facility Status and Proposed Upgrades Text, figures – mostly there except few sections, References to be added 1 10.1. Abstract 10.2. Facility / Diagnostic Overview 10.3. Upgrade Project Status and Plan 10.3.1. New Center Stack Upgrade 10.3.2. Second Neutral Beam Injection System Upgrade 10.3.3. NSTX-U Facility Subsystems 10.3.3.1. Rectifier Control Refurbishments 10.3.3.2. Poloidal Field Coil Power Supply Upgrades 10.3.3.3. Migrate Plasma Control System to Modern Processors 10.4. RF Heating and Current Drive Systems 10.4.1. HHFW and upgrades 10.4.2. 28GHz ECH/EBW system 10.5.1. Macro-stability Tools 10.5.1.1. 2nd SPA 10.5.1.2. NCC (Waiting input from Steve and Jack) 10.5.1.3. Massive Gas Injection 10.5.2. Boundary Physics Tools 10.5.2.1. Divertor Cryo-pump (Updated figure is needed) 10.5.2.2. EHO antenna 10.5.2.3. Fueling tools, real-time density diagnostics 10.5.2.4. Lithium Granules Injector for ELM control 10.5.2.5. Upgraded lithium coating systems (Need updated description – Lane will provide input today 10.5.2.6. High-Z metallic divertor – Strategy needed – Moly tile installation postponed 10.5.2.7. High-Z outer and inner wall PFCs – Strategy needed

2 M. Ono NSTX FWP 2014 Budget Planning Meeting Apr. 15, 2012 Chapter 10. NSTX-U Facility Status and Proposed Upgrades Masa Ono, Gerhardt, Kaita, Stratton, TSG leaders, Engineering 2 10.5.2.8. Flowing liquid lithium divertor/module 10.5.2.9. Laboratorie for Material Characterization and Surface Chemistry 10.5.3. Start-up and Ramp-up 10.5.3.1. CHI upgrades 10.5.3.2. Plasma Gun Start-up (Waiting for Pegasus input) 10.6. NSTX-U Diagnostic System Status and Plans 10.6.1. Profile Diagnostics 10.6.1.1 Multi-pulse Thomson Scattering Upgrade 10.6.1.2 Charge-Exchange Recombination Spectroscopy 10.6.1.3 Soft X-ray Spectroscopy / Tomography 10.6.1.5. Motional Stark Effect – Laser Induced Fluorescence 10.6.2. Turbulence Diagnostics 10.6.2.1. High-k Scattering System 10.6.2.2. Beam Emission Spectroscopy 10.6.3. MHD Diagnostics 10.6.3.1. Real-Time Velocity Diagnostic 10.6.3.2. Real-Time MSE 10.6.3.3. Real-Time Thomson Scattering 10.6.4. Boundary Physics Diagnostics 10.6.4.1. Material Analysis Particle Probe (MAPP) 10.6.4.2. Divertor Spectrometers 10.6.4.3. Divertor Thomson Scattering 10.6.4.4. Dust Detector and Quartz Microbalances

3 M. Ono NSTX FWP 2014 Budget Planning Meeting Apr. 15, 2012 Chapter 10. NSTX-U Facility Status and Proposed Upgrades Masa Ono, Gerhardt, Kaita, Stratton, TSG leaders, Engineering 3 10.6.5. Energetic Particle Diagnostics 10.6.5.1. Energetic Particle Distribution Diagnostics 10.6.5.2. Energetic Particle Modes Diagnostics 10.6.5.3. Energetic Particle Modes Antenna 10.6.6. Wave Diagnostics (Need input, incorporate into RF section? ) 10.6.7. Start-up, ramp-up, and sustainment diagnostics (Not quite sure if we need this section?) 10.8. NSTX-U Facility Utilization


Download ppt "M. Ono NSTX FWP 2014 Budget Planning Meeting Apr. 15, 2012 Chapter 10. NSTX-U Facility Status and Proposed Upgrades Text, figures – mostly there except."

Similar presentations


Ads by Google