LBT Q1 2008 Eng/SW Review CIN/NIN -Computer and Network Infrastructure
2
4-Apr-2008 LBT Q1 2008 Eng/SW Review Progress Backup tape system installed in Tucson Backup tape system installed in Tucson AGw, DIMM, M2 hexapod UMAC, IR test camera, and anemometor networking support AGw, DIMM, M2 hexapod UMAC, IR test camera, and anemometor networking support Networking architecture for moving the Software group from the Annex to the 5 th floor Networking architecture for moving the Software group from the Annex to the 5 th floor
3
4-Apr-2008 LBT Q1 2008 Eng/SW Review Open Issues Technical Technical Steward IP address inventory Steward IP address inventory Schedule Schedule None None Budget Budget None None Resource Resource None None
4
4-Apr-2008 LBT Q1 2008 Eng/SW Review Planning (Q2/2008) Backup tape system for the mountain Backup tape system for the mountain New Windows server hardware New Windows server hardware New TCS server hardware New TCS server hardware Memory upgrades for mountain workstations Memory upgrades for mountain workstations Telemetry server installation Telemetry server installation New computer racks with cable and power management New computer racks with cable and power management Add more fiber ports to the treehouse Cisco Add more fiber ports to the treehouse Cisco Install new workstations for the developers Install new workstations for the developers
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.