Presentation is loading. Please wait.

Presentation is loading. Please wait.

Zhen YAN, Muon Offline DQ meeting, 05/10/2015 Signed off runs(express stream) since last Friday meeting Default defects:  MS_RPC_BA_ROD_PROBLEM_1  MS_RPC_BC_ROD_PROBLEM_1.

Similar presentations


Presentation on theme: "Zhen YAN, Muon Offline DQ meeting, 05/10/2015 Signed off runs(express stream) since last Friday meeting Default defects:  MS_RPC_BA_ROD_PROBLEM_1  MS_RPC_BC_ROD_PROBLEM_1."— Presentation transcript:

1 Zhen YAN, Muon Offline DQ meeting, 05/10/2015 Signed off runs(express stream) since last Friday meeting Default defects:  MS_RPC_BA_ROD_PROBLEM_1  MS_RPC_BC_ROD_PROBLEM_1 Additional defects/comments  Run 280853  MS_CSC_EA_DISCONNECTED_2  Run 280950  TGC C11 HV glitch Muon Offline DQ shifter report Run 280950 Project Tag: data15_13TeV Run Start: 2015-10-03 19:35 CEST Run End: 2015-10-04 12:19 CEST # lumi blocks: 1062 Events: 49371897 Stable beams: Yes Online ATLAS Ready luminosity: 142.164 pb-1 Run 280853 Project Tag: data15_13TeV Run Start: 2015-10-02 09:12 CEST Run End: 2015-10-02 13:14 CEST # lumi blocks: 258 Events: 2861280 Stable beams: Yes Online ATLAS Ready luminosity: 10.657 pb-1 Run 280862 Project Tag: data15_13TeV Run Start: 2015-10-02 14:56 CEST Run End: 2015-10-03 07:37 CEST # lumi blocks: 1062 Events: 50738248 Stable beams: Yes Online ATLAS Ready luminosity: 147.144 pb-1

2 Zhen YAN, Muon Offline DQ meeting, 05/10/2015 2 I added “MS_CSC_EA_DISCONNECTED_2” defect for CSC since AL05 layer 3 and 4 channels (1-96) dead. Relevant ELOG entries :https://atlasop.cern.ch/elisa/display/27910 6https://atlasop.cern.ch/elisa/display/27910 6 Problem didn’t appear in later runs.

3 Zhen YAN, Muon Offline DQ meeting, 05/10/2015 3 No major issues.

4 Zhen YAN, Muon Offline DQ meeting, 05/10/2015 4 No major issues except TGC HV glitch. No defects needed.

5 Zhen YAN, Muon Offline DQ meeting, 05/10/2015 5 General issues:  CSC  Link loss problem occurs time to time  MDT  Chamber drop/recovery during the run  Pathological/Disabled chambers during long run (randomly)  ~ 10 MLs consistently have low efficiency(<70%) on BIC & BIA (page 6)  RPC  Feet region sectors didn’t fully functional  Data misalign on sector 25  Tower re-sync  TGC  SSW drop and ROD busy (TGC big storm errors) General comments :  Inconsistent default ranges on some web display plots  RPC coverage plots : BA A13 LowPt1 eta, BC C14 RO HighPt0/1 eta and phiBA A13 LowPt1 etaBC C14 RO HighPt0/1 eta and phi  MDT ML efficiency plots : BIS8A10/A14 BML6A/C13 histogram missingBIS8A10/A14 BML6A/C13 histogram missing  Z axis color scheme is good at efficiency plots but not quiet useful on some occupancy/hit plots due to noisy channel and geometry effect  RPC GlobalHitsPerRPCOuter RPC GlobalHitsPerRPCOuter  MDT OccupancyVsLB_ECInner MDT OccupancyVsLB_ECInner  MDT BEE NumberOfHitsInBAExtraPerMultiLayer_ADCCut MDT BEE NumberOfHitsInBAExtraPerMultiLayer_ADCCut  TGC Strip_Occupancy_Map_A TGC Strip_Occupancy_Map_A  Segments_Z_chamberIndex_perSector Segments_Z_chamberIndex_perSector

6 Zhen YAN, Muon Offline DQ meeting, 05/10/2015 6

7 7 Backup slides

8 Zhen YAN, Muon Offline DQ meeting, 05/10/2015 8 Further concerning :  ACR shifter  Offline DQ shifter  Usually offline DQ shifter has to dig out useful information based on the shift summary submitted by ACR shifter which they written with their personal style  Online DQ report is the proper solution and it can be done with good shifter  Sub-detector on-call expert  Offline DQ shifter  Join the DQ meeting every Monday, Wednesday and Friday  Update the detector condition and known problems to DQ shifter in time  Daily summary(like TGC) or Run base summary(DQ shifter) to ELOG  Offline DQ expert  Offline DQ shifter  Specific explanation on those intolerable defects(documents, references and examples)  Optimize/Tuning offline DQ plots  Document more tracking plots(MCP part) if possible My concerning and proposal (just for leading discussion)

9 Zhen YAN, Muon Offline DQ meeting, 05/10/2015 9 Really good and useful DQ report from online Muon shifter “Carsten Bittrich” https://atlasop.cern.ch/elisa/display/279560 Could be even better if we specify the template with well pre-defined catalogue/checklist


Download ppt "Zhen YAN, Muon Offline DQ meeting, 05/10/2015 Signed off runs(express stream) since last Friday meeting Default defects:  MS_RPC_BA_ROD_PROBLEM_1  MS_RPC_BC_ROD_PROBLEM_1."

Similar presentations


Ads by Google