PROPOSED US 34 IMPROVEMENT (4-LANE EXPRESSWAY)
2
CARMAN RD. TO TR 111 (1350 E) – (8.1 MILES) Construction Plan Preparation – Funded (Strand Assoc.) Plan Preparation has been put on hold due to levee decertification The Phase I study and Environmental Impact Statement (EIS) will be re-opened for this section during 2012 Currently working with FHWA to the define scope of work Cost estimates will be revised as the study progresses
3
TR 111 TO TR 190 E OF BIGGSVILLE WITH INTERCHANGE (4.7 MILES) Construction Plan Preparation – Funded (Poepping, Stone, Bach & Assoc.) Utility Adjustments – Funded Land Acquisition – Funded Construction Engineering – Funded Construction – Funded Plan Preparation and Land Acquisition are underway Anticipate Late Fall 2012 Letting Funded through the Illinois Jobs Now! Program
4
TR 190 EAST OF BIGGSVILLE TO S. OF KIRKWOOD (4.5 MILES) Construction Plan Preparation – Funded (Geotech Engineering & Testing) Plan Preparation nearing completion
5
S. OF KIRKWOOD TO US 67 AT MONMOUTH (6.7 MILES) Construction Plan Preparation – Funded (CMT) Plan Preparation nearing completion