Download presentation
Presentation is loading. Please wait.
Published bySheena Nicholson Modified over 9 years ago
1
How Tribes Use Models Part 1 Navajo Nation Environmental Protection Agency
2
Tribes Air Quality Planning New Source Review Environmental Assessments Compliance Tracking
3
Air Quality Planning FIP/SIP/TIP CAA Rulemaking NAAQS Regional Haze
4
New Source Review Emission Limits Operating Condition Control Technology (BACT, RACT, MACT) Tribal Minor Source (TNSR) Prevention of Significant Deterioration (“PSD”) Non- Attainment Minor Source (“NA NSR”)
5
Lease Renewal Major Source Siting New Source Class 1 Areas Air Shed Protection Environmental Assessments Emission Inventory Existing Sources Impacts Validation of Air Quality Monitors Siting Air Monitors Compliance Tracking
6
Navajo Nation Case Study Environmental Impact Statement – Four Corners Power Plant & Navajo Mine – Navajo GS & Peabody Mine PSD Permits – Desert Rock, Navajo GS, Four Corners Best Available Retrofit Technology (“BART”) – NGS, FCPP Tribal Minor New Source Review
7
Four Corners Power Plant and Navajo Mine Energy Project Power Plant Lease Amendment Energy Transmission Lines Coal Mine Area
10
Air Quality Modeling Class II / Criteria Pollutant Modeling – Impacts from FCPP and Navajo Mine – Met data/ Ambient Background – Nearby Sources/Fenceline/Boundary Class II Plume Visibility Modeling Class 1 Modeling ( “BART”) and Acid Deposition EIS Section 7/ESA Ozone Modeling AERMOD, PLUVUE II, CALPUFF, CAMx
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.