Download presentation
Presentation is loading. Please wait.
Published byDominick Whitehead Modified over 9 years ago
1
1 spi5a SEL’s Software Process-Improvement Program Vic Basili et al. IEEE Software, Nov 1995
2
2 spi5a Numbers u What are your favorite “numbers” or “results” from this article? –Error detection rates half per phase –Cleanroom works –Effort distribution –11% overhead
3
3 spi5a Goals u Which of the following are the current goals of SEL? –A. Smaller products –B. Faster turnaround –C. Process Improvement –D. Understanding Baseline –E. Tech Transfer –F. ?
4
4 spi5a Baseline u What is a baseline? –A. line between home and first –B. average values –C. first version of a product –D. minimum schedule
5
5 spi5a SEL and baselines u Why are baselines important to SEL? –A. assess improvements –B. demonstrate that SEL is working –C. easy to plot –D. document that process are being applied correctly
6
6 spi5a Planning u Which of the following is part of SEL’s procedures? –A. clear goals for a project –B. packaging improvements –C. assessing changes –D. measure –E. adopt, discard, or revise
7
7 spi5a Class Discussion u What would be the advantage of making every development an experiment? u What goals would be appropriate in a company?
8
8 spi5a Software Process Improvement at Raytheon Thomas Haley IEEE Software Nov 96 text pp76-84
9
9 spi5a A Software Business u “As with most system houses, software’s role at Raytheon expanded dramatically during the ‘80s”
10
10 spi5a Question u When does a company become a “software company” –A. When the software revenues become a majority of the business –B. When the areas of growth are in software –C. When all of the management realizes it
11
11 spi5a SPI critical activities u Establish a strong and effective software process infrastructure for continuous improvement and to maintain the team’s enthusiasm over time u measure and analyze process and project data to quantify the benefits of spi
12
12 spi5a Working Groups u Policy and procedures u Training u Tools and methods u Process database or metrics
13
13 spi5a Leverage Points u Product Improvement –system definition, software requirements, inspections, testing u Process Improvement –planning, pathfinding
14
14 spi5a Cost of Quality u Nonconformance –direct and indirect costs of rework u Conformance –appraisal and prevention costs u Which is now higher in Raytheon?
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.