Download presentation
Presentation is loading. Please wait.
Published byEsther Webster Modified over 9 years ago
1
AVAILABILITY BASED TARIFF AND SCHEDULING MECHANISM
2
THE INDIA ELECTRICITY MARKET TIME LINE REAL TIME 15 MT BLOCKS LONG TERM BENEFICIARY CAPACITY ALLOCATION > 5 YEARS POWER PURCHASE AGREEMENTS CAPACITY COMMITTMENT 1-5 YEARS SHORT TERM AGREEMENTS DAY-AHEAD SCHEDULING DAY AHEAD - 3 MONTHS
3
Components of inter-utility tariff (Pre – ABT Mechanism i.e. the mechanism used to exist about 5 years back) Tariff used to consist of the following built-in components: Fixed charges - Interest on loans - Depreciation - O & M charges - Return on equity - Interest on Working Capital Energy charges (fuel cost) Incentives Surcharge & other levies No charge for reactive energy
4
TENTATIVE COST FOR NTPC THERMAL STATIONS FOR THE MONTH OF JUNE 2004 Station Fixed Cost Rs. Cr/yr (1) Average Fixed Cost Rs. Cr/day (2) Average Fixed Cost P / KWh (3) Variable Base Cost P / KWh (4) Variable FPA P / KWh (5) Total Variable Base Cost P / KWh (6) Composite Cost P / KWh (3) + (6) Ramagundam486.121.33226.4382.141.0683.20109.63 Talcher Stage II 564.721.54742.9842.263.2145.4788.45 Singrauli364.590.99628.2767.987.8675.84 104.11 104.11 Rihand478.741.33065.83106.0344.7078.99137.41 Unchahar – I 195.910.53573.3555.836.74112.77186.12 Anta GPS* 92.920.25847.1360.5584.11144.66139.47 Auraiya GPS* 160.200.44542.1761.9292.88154.80169.73 DadriGPS G) 210.960.57637.2095.140.2495.38132.58 Dadri (T) 416.781.15876.9790.5655.57146.13229.24 Unchahar – II ---------103.286.98110.26473.75 Dadrigas(L)---------356.3471.21436.55 *Rates for mixed fuel (gas+ liquid fuel, naphtha)
5
Availability Based Tariff (ABT) the presently followed mechanism Tariff is split into the following separate components: Capacity charges Energy charges Unscheduled Interchange (UI)
6
AVAILABILITY BASED TARIFF (A) CAPACITY CHARGE (B) ENERGY CHARGE (C) ADJUSTMENT FOR DEVIATIONS (U I CHARGE) (U I CHARGE) (A) = a function of the Ex-Bus MW availability of Power Plant for the day declared before the day starts x SEB’s % allocation from the plant (B) = MWh for the day as per Ex-Bus drawal schedule for the SEB finalised before the day starts x Energy charge rate (C) = Σ (Actual energy interchange in a 15 minute time block – scheduled energy interchange for the time block) x UI rate for the time block TOTAL PAYMENT FOR THE DAY = (A) + (B) ± (C)
7
FEATURES : ( A) and (B) do not depend on actual plant generation / drawal. No metering required for this as they are based on off-line figures. All deviations taken care of by (C) No complication regarding deemed generation. Perpetual incentive for maximizing generation and reducing drawal during deficit, but no incentive to over generate during surplus.
8
IN SR 17935 MW OF THERMALS OUT OF 19227 MW (93%) HAS VARIABLE COST THAT FALLS IN THE RANGE OF 60PAISE TO 400 PAISE DETAILS>400 Ps/u CAP N D ESC TO EXIT
10
DAY AHEAD SCHEDULING Schedules are made for each 15 minute time block wise on day ahead basis i.e. 96 time blocks in a day. Participating agencies are ISGS and States. Bilaterals/STOAs are also included in the preparation of schedules. RLDC prepares and coordinates the schedules. On the day of operation the schedules can be revised with prior intimation i.e. 4 to 6 time blocks.
11
SCHEDULING Availability Declaration Entitlements SLDCSLDC Requisition & Bilateral Agreements Injection Schedule Drawal Schedule Revision in DC Revision in Requisition Final Injection Schedule Final Drawal Schedule 10:00 11:00 15:00 17:00 22:00 23:00 RLDCRLDC ISGSISGS Time Revisions during Current day Revisions during Current day 0 to 24 hours RLDC
12
TIME TABLE FOR EXCHANGE OF INFORMATION IN RESPECT OF SCHEDULING By 10.00 hrs.ISGSs shall advise SRLDC the Station-wise MW and MWh capabilities By 1100 Hrs.SRLDC shall advise the States / Beneficiaries the Station wise MW & MWh entitlements. By 1500 hrs.SLDCs/ Beneficiaries shall communicate the Station-wise requisitions and details of bilateral exchanges to SRLDC. By 1700 hrs.SRLDC shall convey the ex-power plant despatch schedule to each ISGS and net drawal schedule to each State / Beneficiary. The details of unrequisitioned surpluses shall also be intimated. By2200 hrs.ISGSs / States / Beneficiaries shall inform the modifications, if any, for incorporating in the final schedule By 2300 hrs.SRLDC shall issue the final despatch and drawal schedule. ESC TO EXIT
13
BY 10: 00 HRS ISGSs shall advise SRLDC the Station-wise MW and MWh capabilities Back SAMPLE DC SHEET
14
BY 11: 00 HRS Back SRLDC shall advise the States / Beneficiaries the Station wise MW & MWh entitlements. SAMPLE ENT. OF STATES
15
BY 15: 00 HRS SLDCs/ Beneficiaries shall communicate the Station-wise requisitions and details of bilateral exchanges to SRLDC. Back
16
BY 17: 00 HRS SRLDC shall convey the ex-power plant despatch schedule to each ISGS SRLDC shall convey the net drawal schedule to each State / Beneficiary The details of unrequisitioned surpluses shall also be intimated. Back SAMPLE SCHD OF STATES SAMPLE SCHD OF ISGS
17
BY 22 00HRS Back ISGSs / States / Beneficiaries shall inform the modifications, if any, for incorporating in the final schedule
18
BY 23 00HRS SRLDC shall issue the final ex-power plant despatch schedule to each ISGS SRLDC shall issue the final net drawal schedule to each State / Beneficiary Back
20
SHOW TABLE HIDE TABLE 30 Ps 45 Ps 80 Ps
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.