1 AVAILABILITY BASED TARIFF AND SCHEDULING MECHANISM

2 THE INDIA ELECTRICITY MARKET TIME LINE REAL TIME 15 MT BLOCKS LONG TERM BENEFICIARY CAPACITY ALLOCATION > 5 YEARS POWER PURCHASE AGREEMENTS CAPACITY COMMITTMENT 1-5 YEARS SHORT TERM AGREEMENTS DAY-AHEAD SCHEDULING DAY AHEAD - 3 MONTHS

3 Components of inter-utility tariff (Pre – ABT Mechanism i.e. the mechanism used to exist about 5 years back) Tariff used to consist of the following built-in components:  Fixed charges - Interest on loans - Depreciation - O & M charges - Return on equity - Interest on Working Capital  Energy charges (fuel cost)  Incentives  Surcharge & other levies  No charge for reactive energy

4 TENTATIVE COST FOR NTPC THERMAL STATIONS FOR THE MONTH OF JUNE 2004 Station Fixed Cost Rs. Cr/yr (1) Average Fixed Cost Rs. Cr/day (2) Average Fixed Cost P / KWh (3) Variable Base Cost P / KWh (4) Variable FPA P / KWh (5) Total Variable Base Cost P / KWh (6) Composite Cost P / KWh (3) + (6) Ramagundam486.121.33226.4382.141.0683.20109.63 Talcher Stage II 564.721.54742.9842.263.2145.4788.45 Singrauli364.590.99628.2767.987.8675.84 104.11 104.11 Rihand478.741.33065.83106.0344.7078.99137.41 Unchahar – I 195.910.53573.3555.836.74112.77186.12 Anta GPS* 92.920.25847.1360.5584.11144.66139.47 Auraiya GPS* 160.200.44542.1761.9292.88154.80169.73 DadriGPS G) 210.960.57637.2095.140.2495.38132.58 Dadri (T) 416.781.15876.9790.5655.57146.13229.24 Unchahar – II ---------103.286.98110.26473.75 Dadrigas(L)---------356.3471.21436.55 *Rates for mixed fuel (gas+ liquid fuel, naphtha)

5 Availability Based Tariff (ABT) the presently followed mechanism Tariff is split into the following separate components:  Capacity charges  Energy charges  Unscheduled Interchange (UI)

6 AVAILABILITY BASED TARIFF (A) CAPACITY CHARGE (B) ENERGY CHARGE (C) ADJUSTMENT FOR DEVIATIONS (U I CHARGE) (U I CHARGE) (A) = a function of the Ex-Bus MW availability of Power Plant for the day declared before the day starts x SEB’s % allocation from the plant (B) = MWh for the day as per Ex-Bus drawal schedule for the SEB finalised before the day starts x Energy charge rate (C) = Σ (Actual energy interchange in a 15 minute time block – scheduled energy interchange for the time block) x UI rate for the time block TOTAL PAYMENT FOR THE DAY = (A) + (B) ± (C)

7 FEATURES :  ( A) and (B) do not depend on actual plant generation / drawal. No metering required for this as they are based on off-line figures. All deviations taken care of by (C)  No complication regarding deemed generation.  Perpetual incentive for maximizing generation and reducing drawal during deficit, but no incentive to over generate during surplus.

8 IN SR 17935 MW OF THERMALS OUT OF 19227 MW (93%) HAS VARIABLE COST THAT FALLS IN THE RANGE OF 60PAISE TO 400 PAISE DETAILS>400 Ps/u CAP N D ESC TO EXIT

9

10 DAY AHEAD SCHEDULING Schedules are made for each 15 minute time block wise on day ahead basis i.e. 96 time blocks in a day. Participating agencies are ISGS and States. Bilaterals/STOAs are also included in the preparation of schedules. RLDC prepares and coordinates the schedules. On the day of operation the schedules can be revised with prior intimation i.e. 4 to 6 time blocks.

11 SCHEDULING Availability Declaration Entitlements SLDCSLDC Requisition & Bilateral Agreements Injection Schedule Drawal Schedule Revision in DC Revision in Requisition Final Injection Schedule Final Drawal Schedule 10:00 11:00 15:00 17:00 22:00 23:00 RLDCRLDC ISGSISGS Time Revisions during Current day Revisions during Current day 0 to 24 hours RLDC

12 TIME TABLE FOR EXCHANGE OF INFORMATION IN RESPECT OF SCHEDULING By 10.00 hrs.ISGSs shall advise SRLDC the Station-wise MW and MWh capabilities By 1100 Hrs.SRLDC shall advise the States / Beneficiaries the Station wise MW & MWh entitlements. By 1500 hrs.SLDCs/ Beneficiaries shall communicate the Station-wise requisitions and details of bilateral exchanges to SRLDC. By 1700 hrs.SRLDC shall convey the ex-power plant despatch schedule to each ISGS and net drawal schedule to each State / Beneficiary. The details of unrequisitioned surpluses shall also be intimated. By2200 hrs.ISGSs / States / Beneficiaries shall inform the modifications, if any, for incorporating in the final schedule By 2300 hrs.SRLDC shall issue the final despatch and drawal schedule. ESC TO EXIT

13 BY 10: 00 HRS ISGSs shall advise SRLDC the Station-wise MW and MWh capabilities Back SAMPLE DC SHEET

14 BY 11: 00 HRS Back SRLDC shall advise the States / Beneficiaries the Station wise MW & MWh entitlements. SAMPLE ENT. OF STATES

15 BY 15: 00 HRS SLDCs/ Beneficiaries shall communicate the Station-wise requisitions and details of bilateral exchanges to SRLDC. Back

16 BY 17: 00 HRS SRLDC shall convey the ex-power plant despatch schedule to each ISGS SRLDC shall convey the net drawal schedule to each State / Beneficiary The details of unrequisitioned surpluses shall also be intimated. Back SAMPLE SCHD OF STATES SAMPLE SCHD OF ISGS

17 BY 22 00HRS Back ISGSs / States / Beneficiaries shall inform the modifications, if any, for incorporating in the final schedule

18 BY 23 00HRS SRLDC shall issue the final ex-power plant despatch schedule to each ISGS SRLDC shall issue the final net drawal schedule to each State / Beneficiary Back