Download presentation
Presentation is loading. Please wait.
Published byMilton Goodman Modified over 9 years ago
1
SCT Testbeam: report & plans Gareth Moorhead (with thanks to Lars Eklund for being there for me) Uppsala 13 June 2003
2
G.F.Moorhead SCT Testbeam Update June 2003, SCT Week @ Uppsala Contents Report on the recent beamtest 19 May to 02 June (most details to follow in Jose & Sergio's talk) Next beamtest: August - September 2003 –Dates not yet final due to SPS proton run extension 2004: Inner Detector Common Run –Advance warning
3
G.F.Moorhead SCT Testbeam Update June 2003, SCT Week @ Uppsala Testbeam May - June 2003 Participants Sophie Chouridou, Bettina Mikulec - CERN Yohsei Iwata, Akiko Imoto - Hiroshima University Ryuichi Takashima - Kyoto University of Education Christian Ketterer - Freiburg Allan Clark, Mariane Mangin-Brinet, Shulamit Moed - Geneva Tom Atkinson, Gareth Moorhead - Melbourne Reisaburo Tanaka, Youji Tomeda - Okayama University Peter Kodys - Prague Charles University Stan Bentvelsen, Thijs Cornelissen, Sandra Muijs - NIKHEF Paul Dervan - Sheffield Jose Enrique Garcia Navaro, Sergio Gonzalez, Marcel Vos - IFIC Valencia Apologies to anyone forgotten
4
G.F.Moorhead SCT Testbeam Update June 2003, SCT Week @ Uppsala Testbeam May - June 2003 Schedule: 12 May - 05 June MonTueWEdThuFriSatSunMonTueWedThuFriSatSunMonTueWedThuFriSatSunMonTueWedThu 12 / 513 / 514 / 515 / 516 / 517 / 518 / 519 / 520 / 521 / 522 / 523 / 524 / 525 / 526 / 527 / 528 / 529 / 530 / 531 / 501 / 602 / 603 / 604 / 605 / 6 Pre-characterisation in Irrad. Lab. (Christian) Installation at H8 & in-situ characterisation Beam tuning (Adrian Fabrice - Many thanks) Normal beam SCT priority 25ns beam MDT & TGC priority - 1st Level Trigger tests SCT, PIX, TRT, TileCal also running Post- characterisation Installation at H8 De-installation (Abbreviated from the original plan due to the PS startup problems and subsequent SPS "beam scrubbing" run)
5
G.F.Moorhead SCT Testbeam Update June 2003, SCT Week @ Uppsala Testbeam May - June 2003 Schedule Two periods: 3 days of SCT priority with normal beam, 4.8 s spill length - Random trigger => TDC cut 10ns/25ns as usual (40% efficiency) 7 days of 25ns beam, multiple users, 2.6 s spill length (fewer events / spill) - Synchronous trigger => No TDC cut (all events in time - we hope !) - Included 1 day of SCT priority for magnet & material studies which excluded other users Multi-user periods worked reasonably well. Pixels relocated to NA45 (upstream position) to reduce conflicts Opportunities to use Magnet or low momentum beam were very limited
6
G.F.Moorhead SCT Testbeam Update June 2003, SCT Week @ Uppsala Testbeam May - June 2003 Modules ModuleTypeIrradiated ?Comment 20220330200003BarrelFULL; 10 Oct 2002Irradiated unpowered, unbiased 20220170200153BarrelFULL; 10 Oct 2002Irradiated unpowered, unbiased 20220170200010BarrelNoLarge Negative Offset on 1 chip 20220170200447BarrelNo (goes to irrad)Large Gain Spread on 2 chips 20220040200018BarrelNo (goes to irrad)Anchor; Large Oscillation module K5_312Endcap OuterFULL K5_503Endcap OuterFULL K5_504Endcap OuterFULL K5_310Endcap OuterHALF K5_303Endcap OuterHALF k5_306Endcap MiddleNoMPI/Prague 20220130000002Endcap OuterNoGeneva/CERN Pre-qualification module 3 Barrel modules with anomalies - two will go after to Irradiation, and then Beamtest again in September 2 Barrels irradiated unpowered & unbiased 5 Irradiated endcaps - individual performance & also tracking study using 3 fully irradiated modules 1 pristine "Pre-qualification" outer endcap for comparison, plus a middle for interest
7
G.F.Moorhead SCT Testbeam Update June 2003, SCT Week @ Uppsala Testbeam May - June 2003 Program One module as anchor (efficiency reference at 1 fC, 150 V), barrel 00010 Standard performance studies at several positions across modules Threshold scans (Qthr) at bias combinations: Irradiated: 350 V, 500 V, 400 V Unirradiated: 150 V, 300 V, 200 V Bias scans (Vdet) at thresholds: 0.9 fC, 1.0 fC, 1.1 fC, 1.2 fC, 1.5 fC... then the fun stuff... Relative timing adjustment (signal cable length): all modules +/- approx 3 ns Synchronous beam (25ns) timing scan - efficiency versus trigger cable delay Tracking studies at 180 GeV/c, magnet 0 A, 2500 A, 5000 A (~ 0, 0.8, 1.6 T) Low momentum multiple scattering study : 50, 20, 10 GeV/c pions Target studies, 10 mm Tungsten target immediately upstream of modules to look GEANT4 simulation
8
G.F.Moorhead SCT Testbeam Update June 2003, SCT Week @ Uppsala Comments... SCTLV3 gave many problems... too many dead channels; several channels failed in service during the ~ 3 week continuous use The two barrel modules irradiated unpowered & unbiased were operated at Vcc = 3.8 V as no useful performance could be found at Vcc = 3.5 V Noise in H8 (12 modules in proximity, no metal cover plates etc.) ~100 - 300 electrons worse than lab., as previously experienced Details, including all standard characterisations in lab., and before and after at H8, can be found at: http://atlas.web.cern.ch/Atlas/GROUPS/INNER_DETECTOR/SCT/tbMay2003/
9
G.F.Moorhead SCT Testbeam Update June 2003, SCT Week @ Uppsala Next beamtest : September 2003 Currently scheduled: –SCT main or co-user run 28 Aug to 2 Sep –ATLAS Common DAQ run 3 to 8 Aug However, the Research Board has approved 2 week extension to compensate for the time lost due to the beam scrubbing run Likely but not certain we will have ~ 2 weeks in September including the Common DAQ run Program: - Standard studies of the modules irradiated during this year, including the Large Gain Spread barrel - Common DAQ run... minimal port of existing Mustard/Slog readout to ATLAS DAQ-1 to participate in common triggers
10
G.F.Moorhead SCT Testbeam Update June 2003, SCT Week @ Uppsala 2004 Last planned year of SPS beamtest Emphasis on ATLAS Integration testing –Common DAQ –Common clock & triggers >>> common events –Tests of Level 1 Trigger –Dataflow (ROD s-links to ROS etc.) –Event Filter –Offline software - reconstruction etc. Within this context, the Inner Detector is planning a combined Pixel / SCT / TRT common run.... Now in early discussion phase - please contact Gareth if interested in following developments.
11
G.F.Moorhead SCT Testbeam Update June 2003, SCT Week @ Uppsala
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.