Download presentation
Presentation is loading. Please wait.
Published byJuliana Craig Modified over 9 years ago
1
Leveraging Research University Innovation Erv Blythe VP for Information Technology February 17, 2005
2
Institutional Repositories Electronic Theses & Dissertations Multimedia (audio, video, graphic, animation, etc) Scientific visualizations of datasets Text files (spreadsheets, documents, PDF, etc) Executable code
3
http://eportfolio.vt.edu
4
Research Computing System X
5
System was upgraded to 1100 dual 2.3 GHz G5 Xservers; Completed Mid-July 2004 Ranked number 7 at 12.25 TF www.top500.org www.top500.org
6
National LambdaRail and VORTEX National and State Optical Research Network Evolution
7
NLR Infrastructure Owned fiber (20 years) nationwide Layer 1: DWDM supporting up to 40 10 Gbps lambdas Layer 2: Gigabit Ethernet Layer 3: IP Wavelengths to support additional Layer 2 and 3 experimental or production networks Possible additional experimental Layer 1 infrastructure
8
The Ownership Society (Karl Rove Eat Your Heart Out) FIBER LINK EQUIPMENT INTERNET ROUTERS APPLICATIONS FIBER LINK EQUIPMENT INTERNET ROUTERS APPLICATIONS FIBER LINK EQUIPMENT INTERNET ROUTERS APPLICATIONS Regular Internet Internet2National LambdaRail Ownership of all layers of the OSI stack gives us unprecedented control and flexibility.
9
Virginia Optical Research Technology Exchange (VORTEX) Virginia Tech University of Virginia George Mason University Virginia Commonwealth University College of William and Mary Old Dominion University NWV gigaPOP Internet2 Mid Atlantic Crossroads National LambdaRail Virginia Optical Research Technology EXchange VORTEX New Optical Backbone System 10Gps DWDM links to each participant Competitive advantage for Virginia Research Partnership with Verizon -> Economic Development Support from Governor and Legislature Under construction, operational July 2006
10
Gigabit Ethernet All Faculty, Staff & Academic desktops in Blacksburg 30 Month plan Needs Driven Centralized Storage Centralized Storage Research Research Shared Faculty appointments Shared Faculty appointments
11
Wireless Deployment Planning started 2/04 700 802.11B/G APs installed summer ’04 Installed with 3 crews of 3 Covers 85% of academic and administrative spaces (no dorms) Continuing installation totals 940 APs Distributed, Web-based access control using PID/password Future: 802.1x/EAP for access control
15
Putting VT IT Knowledge to Work High Performance Computing Security and Privacy National Lambda Rail Mid-Atlantic Terascale Project Wireless Networking Optical Network Infrastructure To participate or learn more … Go to www.ecorridors.vt.edu featured links, “Putting VT IT knowledge to work” www.ecorridors.vt.edu
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.