Brentwood Union Free School District 2006 Bond Referendum Capital Improvement Program Pool Phase, All Alternates April 19, 2007 Prepared by:

Similar presentations


Presentation on theme: "Brentwood Union Free School District 2006 Bond Referendum Capital Improvement Program Pool Phase, All Alternates April 19, 2007 Prepared by:"— Presentation transcript:

1 Brentwood Union Free School District 2006 Bond Referendum Capital Improvement Program Pool Phase, All Alternates April 19, 2007 Prepared by:

2 Pool Phase “Ross House Pool” Bids have been received from all Contractors and have been evaluated. The Architect and CM have reviewed all bids and have conducted Contractor qualification meetings for all apparent low bidders. The Architect and CM have generated a letter of recommendation to the District for each qualified low bidder associated with the project. The Board of Education has awarded the Pool project. Kick-off meetings to be set up. Brentwood UFSD

3 Alt. G-1 New Changing Area and Storage Room Brentwood UFSD

4 Alt. G-2 Spectator Seating Area Expansion Brentwood UFSD

5 Alt. G-3 Diving Area Brentwood UFSD

6 Alt. G-4 Replace Entire Existing Roof Brentwood UFSD

7 Alt. G-5 Ceramic Wall Tile At “Project East” Wall Brentwood UFSD

8 Alt. G-6 Ceramic Tile At “Project North” Wall Brentwood UFSD

9 Alt. G-8 New Ceiling and Floor at Vestibules Brentwood UFSD