Download presentation
Presentation is loading. Please wait.
Published byJoshua McKinney Modified over 9 years ago
1
2/17/2016 Recycler -Gattuso Recycler Shut Down Status Flying Wire Status Wire Vacuum Certified Tunnel Bake Prep status Disconnection of BPM, Correctors, ect -Done Check bake out circuits -Done Waiting on MI-62 Lambertson Bake to be completed Damper Kickers Kickers Vacuum Certified (final scan this morning) Tunnel Bake Prep status Bake setup is complete -Done Stands are installed -Done At the stage of cutting into the beam pipe and welding on new flanges R32 line Vacuum Burst Investigation Replaced Ion pump connector on several ion pumps Prepping the area for a leak checking
2
2/17/2016 Recycler -Gattuso
3
Ecool Studies Period Almost doubled the maximum beam current that can be recirculated New ‘world record’ 1.8 A, 4.34 MV –7.8 MW of DC beam HV stability being a problem on its own (even at low current), limit to stable operation is not established Max current appears to be limited by the amount of losses to the tubes No indications that the collector is the limitation Shut Down Work Starts next Tuesday June 16 th (4-5 weeks)
4
2/17/2016 Recycler -Gattuso Ecool work list New SF6 Skid Repair of the following Vacuum Componets IPA03 TPS S05 Replacement of shaft Bearings Repair Collector Current read back Repair Pulser switch Upgrade Fault protection system Misc Maintenance
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.