Department of Army Permitting Process: Dredging
Felicity Dodson Regulatory Project Manager Regulatory Division USACE Galveston District Dredging Your Docks Seminar Houston, Texas November 5, 2014
2
Section 10 Rivers and Harbors Act of 1899 (33 U.S.C. 401)
Structures and/or work in, or affecting, navigable waters of the United States. Structures and/or work outside the limits of navigable waters, IF these structures or work could affect the course, location, or condition of the waterbody so as to impact its navigable capacity. Artificial islands, installations, or other devices on the outer continental shelf. .
3
Section 404 Clean Water Act (33 U.S.C 1344)
Discharge of dredged or fill material. Activities Regulated as a Discharge: Addition of dredged material to a specified discharge site located in waters Runoff or overflow from a contained land or water disposal area Any addition, including more than incidental redeposit of dredged material, mechanized land clearing, ditching, channelization, or other excavation
4
Section 103 Marine Protection, Research, and Sanctuaries Act (Ocean Dumping Act - 33 U.S.C. 1413)
Transportation of dredged material by vessel or vehicle for purpose of dumping in ocean waters at sites designated by EPA under 40 CFR 228. Third Party Use process currently evaluated on a case-by-case basis, while evaluation process is being updated.
5
Department of the Army (DA) Permits
Nationwide Permits Authorizes Section 10 and Section 404 actions Minimal impact to aquatic environment Streamlined permit review process Letters of Permission Authorizes Section 10 Actions ONLY Non-Controversial Actions 15-Day Interagency Coordination Standard Permit Authorizes Section 10 and Section 404 Actions Controversial Actions 30-Day Public Notice
6
Nationwide Permits (NWPs) for Docks and Dredging
NWP 3 – Maintenance (not including dredging) NWP 13 – Bank Stabilization NWP 19 – Minor Dredging NWP 35 – Maintenance Dredging of Existing Basins NWP 16 – Water Quality Certification for return water from upland disposal BE SURE TO CHECK: Pre-Construction Notification (PCN) requirement General Conditions (All NWPS) Regional Conditions (by state or geographic region)
7
Specific Issues Related to Dredge Material Placement
Confined Upland Placement Beneficial Use (BU) Options Material testing requirements If DMPA/BU site is located in Louisiana, coordination with LA State Agencies is required
8
Beneficial Uses of Dredged Material
Evaluated on case-by-case basis for: Wetland Habitat Shoreline Protection Beach Renourishment Many other options Capacity and repeat usage depends on site characteristics
9
Sediment Testing Requirements
Requirements vary by site May be required by multiple agencies DMPA or BU Sponsor/Owner Navigation District State Water Quality Certifying agency (TCEQ, LADEQ) EPA (in certain cases) Oversite rests with the requiring agency. Early consultation can save your schedule and budget!
10
San Jacinto Waste Pits (SJWP) Area of Concern (AOC) 2009 Public Announcement
11
SJWP AOC Review Process
All projects in AOC reviewed by TCEQ Superfund Section for potential impacts All Nationwide Permits in AOC require PCN (No non-reporting NWPs in AOC) For dredge material placement: Test results determine possible placement options See handout for link to Public Announcement and agency contact information Existing Permits in AOC, that still require work or maintenance, must complete AOC process
12
Questions! Contact us: Permit Mailing Address:
U. S. Army Corps of Engineers Galveston District CESWG-RD-E P.O. Box 1229 Galveston, TX Telephone: Fax: (call ahead to schedule a meeting) District Office Location: U.S. Army Corps of Engineers Jadwin Building 2000 Fort Point Road Galveston, TX 77550 On the web at:
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.