Presentation is loading. Please wait.

Presentation is loading. Please wait.

1 DEAT’s Section 20 Permitting in terms of the ECA: Permitting Procedure and Progress reporting to the Institute of Waste Management.

Similar presentations


Presentation on theme: "1 DEAT’s Section 20 Permitting in terms of the ECA: Permitting Procedure and Progress reporting to the Institute of Waste Management."— Presentation transcript:

1 1 DEAT’s Section 20 Permitting in terms of the ECA: Permitting Procedure and Progress reporting to the Institute of Waste Management

2 2 OBJECTIVE To give the Institute of Waste Management “IWM” progress on permitting in terms of s.20 of the ECA as amended since the transfer of the function from DWAF to DEAT on the 3 rd of January 2006 To outline the current permitting process. To discuss the best way forward

3 3 BACKGROUND ECA amendment and the transfer of landfill permitting function under s.20 of ECA from DWAF to DEAT on 3 Jan 2006 Outline of Draft MoA between DWAF to DEAT (See slide 6) DEAT’s capacity for the landfill permitting function under s.20 of ECA - DEAT established a new sub-directorate for landfill permitting in 2005 -Additional capacity created in 2006 with establishment of new directorate dedicated to waste authorisations and disposal management

4 4 INTRODUCTION: Permitting in the DEAT’s Structure organigram organigram Directorates within DEAT giving input to the permitting Process: Waste Stream Management Legal Services Compliance and Monitoring Air Quality Mngt Environmental Impact Mngt Systems & Tools

5 5 PERMITTING PROCEDURE The Applicant: 1. Fills in Application Form S.20 App. FormS.20 App. Form 2. Sends 3 sets of App. form and supporting docs (EIS, EMP, Maps, studies pertaining to activity, etc ) to Director: Authorisation & Waste Disposal 3. Uses checklist to ensure completeness of documentationchecklist

6 6 PERMITTING PROCEDURE The DEAT: 1.Checks for completeness of application documentation within 14 days 2.Acknowledges receipt for all applications within 14 days 3.If Application is incomplete the acknowledgement letter notifies the applicant about missing information 4.If Complete, 2 sets are sent to DWAF outline of the Draft MoA B/t DEAT & DWAF

7 7 PERMITTING PROCEDURE THE DWAF: Sends App to relevant province 2-6 months later Draft ROD from Province received Final RoD compiled by DWAF Pretoria DWAF ROD sent to DEAT - DWAF informs DEAT if Draft Permit must come back for review THE DEAT: DEAT compiles Draft Permit - 8 Review & 1 Approval steps - whole process takes 6 weeks

8 8 S.20 PERMITS ISSUED DWAF

9 9 S.20 PERMITS ISSUED (DWAF) DEAT in talks with DWAF to take the function

10 10 S.20 PERMITS ISSUED Function transferred to DEAT

11 11 DEAT Permitting - Status Quo

12 12 Towards a more Speedy Permitting Process: Provinces already assigned functions relating to waste disposal management under s.24 of ECA Waste disposal permitting function will be assigned to Provinces (this is consistent with the EIA process already being undertaken by Provinces) DEAT will retain permitting of hazardous waste sites in line with EIA Regulations DEAT will provide support to Provinces for the development of provincial capacity for landfill permitting function

13 13 Estimated Cost for the Development of Prov. Capacity for WDS Permitting Function 2008-20092009-20102010-2011 Baseline allocation R23,255,000R24,243,000R25,213,000 Additional funds required R13,000,000R 8,750,000R 750,000 TotalR46,255,000R32,993,000R25,963,000

14 14 Thank you


Download ppt "1 DEAT’s Section 20 Permitting in terms of the ECA: Permitting Procedure and Progress reporting to the Institute of Waste Management."

Similar presentations


Ads by Google