Download presentation
Presentation is loading. Please wait.
Published byMelvin Gray Modified over 9 years ago
1
11 M27 River Hamble Pollution Control
2
22 M27 River Hamble Pollution Control Location Plan M4 Junctions 7 to 9 WB
3
33 R. Hamble: EC Freshwater Fisheries Directive (Salmonid), SAC (River), SINC (Banks), SSSI (300m north/1km south), Environment Protection Priorities for the Solent (2 out of 4), Solent European Marine Sites, Significant amenity use (3000+ vessels). Risk of pollution to the River Hamble from large spillage on highway. Currently no pollution control mechanism device between the highway drainage and the outfalls Flow control devices at both outfalls servicing the Hamble bridge including new infrastructure to convey flows from the network. New attenuation channel preceding the eastern outfall M27 River Hamble Pollution Control Issues and Recommendations
4
44 14 small bore outlets discharge directly from the bridge deck into the watercourse below and affects passing watercraft. Currently spillage packs for bridge outlets on site Decommissioning of existing outlets in Bridge decking. M27 River Hamble Pollution Control Issues and Recommendations
5
55 M27 River Hamble Pollution Control VM Score and Scheme Cost 5 Scheme Appraisal Non Appraisable Total VM points:7 Total Cost (on PAR):£401,314
6
Thank you. Any questions?
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.