Download presentation
Presentation is loading. Please wait.
Published byJunior McKinney Modified over 8 years ago
1
2010 Summer Projects
2
1 st Floor 2 nd Floor 4 th Floor 3 rrd Floor 5 th Floor Human Health Building Walton Road
3
Human Health Building Human Health Bldg Geo Thermal Wells in P-1 Walton Road P-3 P-1 Human Health Bldg
4
Human Health Building
5
2010-2011 $11 M Infrastructure North Loop HTHW Tunnel - Wilson Boulevard UTS O’Dowd Hall Server Room and Voice of IP O’Dowd Hall Curtain Wall
6
Walton Road Squirrel Road North Loop HTHW Trench Tunnel UTS Server Room
7
North Loop HTHW Tunnel Wilson Boulevard
8
O’Dowd Hall Curtain Wall
10
Potential Projects Summer 2010 Paving – Parking Lots, Entrances & Roads Squirrel Road Repairs (Walton to Featherstone Road) Sidewalks Roofing – ODH, CHP and DHE Storm Water (tied to a Grant request) Elevator – WH Wilson Blvd North Loop HTHW Tunnel ODH UTS Server Room and Voice over IP (Internet Protocol) P-1 Light Pole & Fixture Replacement (DTE Grant) Mechanical System Replacement/Repair
11
Walton Road Squirrel Road Summer 2010 Parking Lot and Entrance Changes
12
1 Walton Road Squirrel Road
13
1 2 Walton Road Squirrel Road
14
1 2 3 Walton Road Squirrel Road
15
1 2 3 4 Walton Road Squirrel Road
16
1 2 3 4 5 Walton Road Squirrel Road
17
1 2 3 4 5 6 P-11 Walton Road Squirrel Road
18
1 2 3 4 5 6 7 Walton Road Squirrel Road P-11
19
1 2 3 4 5 6 7 8 Walton Road Squirrel Road P-11
20
1 2 3 4 5 6 7 9 & 10 8 Walton Road Squirrel Road P-11
21
1 2 3 4 5 6 7 9 & 10 8 11 Walton Road Squirrel Road P-11
22
1 2 3 4 5 6 7 9 & 10 8 11 12 Walton Road Squirrel Road P-11 D
23
1 2 3 4 5 6 7 9 & 10 8 11 12 Walton Road Squirrel Road P-11 A D
24
1 2 3 4 5 6 7 9 & 10 8 11 12 Walton Road Squirrel Road P-11 A B D
25
1 2 3 4 5 6 7 9 & 10 8 11 12 Walton Road Squirrel Road P-11 A B C D
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.