Download presentation
Presentation is loading. Please wait.
Published byAlice Dawson Modified over 9 years ago
1
Ventilation Map N FAB Entry 1 Entry 2 Entry 3 D East Decline West Shaft (Intake) Door Closed Temporary Stopping A Temporary Stopping B Mine Fan ON/OFF Temporary Stopping E Temporary Stopping D D Caved Impassable Temporary Stopping C LHD Impassable Timbers Fire Out
2
Problem Map East Decline West Shaft (Intake) O2 = 20 % CO = 350 ppm NO2 = 3 ppm Smoke O2 = 14 % CO = 14000 ppm NO2 = 150 ppm D Door Open Curtain Open Curtain Open Smoke O2 = 9 % CO = 14000 ppm NO2 = 200 ppm Smoke O2 = 9 % CO = 14000 ppm NO2 = 200 ppm Smoke O2 = 7 % CO = 20000 ppm NO2 = 300 ppm Caved Impassable Water to Roof FAB Water Knee Deep Pager Phone 4 ft. Back Charred Timbers Right & Left Timbers On Fire Mine Fan ON/OFF LHD Impassable Face Drill Scaler Loaded Face with (Unshunted lead wires) Intense Heat Tool Room 1 Set Building Materials Entry 1 Entry 2 Entry 3 Pager Phone D Jim Bell (wet) Pump Controls ON/OFF Break into old mine Bill Owen Door Closed Fire Ext. Ken Sims Loose Roof Smoke O2 = 9 % CO = 14000 ppm NO2 = 200 ppm 2 Sets Building Materials
3
Team Map N East Decline West Shaft FAB Entry 1 Entry 2 Entry 3
4
Fresh Air Base Map N East Decline West Shaft FAB Entry 1 Entry 2 Entry 3
5
Co-Captain’s Map N East Decline West Shaft FAB Entry 1 Entry 2 Entry 3
6
Judges’ Map N East Decline West Shaft Entry 1 Entry 2 Entry 3 FAB
7
20’ x 20’ pillar 20’ x 20’ pillar 20’ x 20’ pillar 20’ x 20’ pillar Construction Map 20’ x 10’ pillar 20’ x 10’ pillar 10’ entries & 10’ crosscuts
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.