Presentation is loading. Please wait.

Presentation is loading. Please wait.

Green Mountain Dairy Green Mountain Dairy Green Mountain Biogas Project 2005 -2007 L&ISCI 430 – N J Rowell ppt.

Similar presentations


Presentation on theme: "Green Mountain Dairy Green Mountain Dairy Green Mountain Biogas Project 2005 -2007 L&ISCI 430 – N J Rowell ppt."— Presentation transcript:

1 Green Mountain Dairy Green Mountain Dairy Green Mountain Biogas Project 2005 -2007 L&ISCI 430 – N J Rowell ppt

2 Location of Biodigester Green Mountain Dairy Sheldon, Vermont

3 CROP APPLICATION BASIC ANAEROBIC SYSTEM FLOW DIAGRAM WASTE STREAM ANAEROBIC DIGESTER SOLIDS PRESS ENGINE/ GENERATOR LAGOON/ LIQUID STORAGE ELECTRICITY RECAPTURED HEAT POTENTIAL SECONDARY TREATMENT 5% SOLIDS LAND DISCHARGE OF LIQUID SOLIDS BACK TO AD FERTILIZER MIXTURES BEDDING DIRECT FERTILIZER (NPK) UTILITY LIQUIDS 30% SOLIDS BIOGAS FARM Green Mountain Dairy’s GHD Anaerobic Digester 10% SOLIDS

4 March 20, 2007  Power production begins  Click to view Video Press coverage

5 Project Benefits  Eliminates manure odor  Reduces Greenhouse gases  Reduces Runoff  Produces Power  Produces Solid by-product for bedding  Solids can be used for gardening


Download ppt "Green Mountain Dairy Green Mountain Dairy Green Mountain Biogas Project 2005 -2007 L&ISCI 430 – N J Rowell ppt."

Similar presentations


Ads by Google