Jesse A. Fisher Mechanical Option Spring 2005 Riverpark Corporate Center, Phase 1 Salt Lake City, Utah
2
Jesse A. Fisher Mechanical Option Spring 2005 Riverpark Corporate Center, Phase 1 Salt Lake City, Utah Purpose Methodology Results Recommendations Intro Purpose Procedure Results Summary Breadth
3
Jesse A. Fisher Mechanical Option Spring 2005 Riverpark Corporate Center, Phase 1 Salt Lake City, Utah Intro Purpose Procedure Results Summary Breadth Riverpark 1 Salt Lake City, Utah 90,000 sf 3 story office building Feb 2001 - Jan 2002
4
Jesse A. Fisher Mechanical Option Spring 2005 Riverpark Corporate Center, Phase 1 Salt Lake City, Utah Intro Purpose Procedure Results Summary Breadth Dedicated Outdoor Air System (DOAS) with Parallel Sensible Cooling and heating Space Ewccsw Oa Ra
5
Jesse A. Fisher Mechanical Option Spring 2005 Riverpark Corporate Center, Phase 1 Salt Lake City, Utah Intro Purpose Procedure Results Summary Breadth Doas chilled water schematic CT T T T CH
6
Jesse A. Fisher Mechanical Option Spring 2005 Riverpark Corporate Center, Phase 1 Salt Lake City, Utah Intro Purpose Procedure Results Summary Breadth Doas chilled water schematic T CT T T T CH
7
Jesse A. Fisher Mechanical Option Spring 2005 Riverpark Corporate Center, Phase 1 Salt Lake City, Utah Intro Purpose Procedure Results Summary Breadth Oa Ra Space cc VAV Box Variable Air Volume System
8
Jesse A. Fisher Mechanical Option Spring 2005 Riverpark Corporate Center, Phase 1 Salt Lake City, Utah Intro Purpose Procedure Results Summary Breadth vav chilled water schematic CT T T CH
9
Jesse A. Fisher Mechanical Option Spring 2005 Riverpark Corporate Center, Phase 1 Salt Lake City, Utah Intro Purpose Procedure Results Summary Breadth vav chilled water schematic T CT T T CH
10
Jesse A. Fisher Mechanical Option Spring 2005 Riverpark Corporate Center, Phase 1 Salt Lake City, Utah Intro Purpose Procedure Results Summary Breadth Existing investigation Single zone non-office buildings modeled with commercial software
11
Jesse A. Fisher Mechanical Option Spring 2005 Riverpark Corporate Center, Phase 1 Salt Lake City, Utah Intro Purpose Procedure Results Summary Breadth Procedure HAP - Building envelope loads excel - addition of space loads EES - transient conditions, equipment and plant models
12
Jesse A. Fisher Mechanical Option Spring 2005 Riverpark Corporate Center, Phase 1 Salt Lake City, Utah Intro Purpose Procedure Results Summary Breadth Dedicated Outdoor Air SystemVariable Air Volume System Air Cooled Chiller Water Cooled Chiller Water Cooled Chiller w/ Water Side Economizer Air Cooled Chiller w/ Air Side Economizer Water Cooled Chiller w/ Air Side Economizer Water Cooled Chiller w/ Water Side Economizer Cooling$20,165$12,140$6,325$13,040$7,415$8,450 Heating$10,885 $10,920.00 $10,920 Fan Energy$2,200$2,200.00 $8,485.00 $8,450 Pump Energy$2,250$2,250.00 $1,500.00 $1,500 Subtotal$35,500$27,475$21,660$33,945$28,320$29,320 Maintenance$3,735$6,415 $3,735$6,415 Total$39,235$33,890$28,075$37,680$34,735$35,735
13
Jesse A. Fisher Mechanical Option Spring 2005 Riverpark Corporate Center, Phase 1 Salt Lake City, Utah Intro Purpose Procedure Results Summary Breadth Dedicated Outdoor Air SystemVariable Air Volume System Air Cooled Chiller Water Cooled Chiller Water Cooled Chiller w/ Water Side Economizer Air Cooled Chiller w/ Air Side Economizer Water Cooled Chiller w/ Air Side Economizer Water Cooled Chiller w/ Water Side Economizer Cooling$20,165$12,140$6,325$13,040$7,415$8,450 Heating$10,885 $10,920 Fan Energy$2,200 $8,485 $8,450 Pump Energy$2,250 $1,500 Subtotal$35,500$27,475$21,660$33,945$28,320$29,320 Maintenance$3,735$6,415 $3,735$6,415 Total$39,235$33,890$28,075$37,680$34,735$35,735
14
Jesse A. Fisher Mechanical Option Spring 2005 Riverpark Corporate Center, Phase 1 Salt Lake City, Utah Intro Purpose Procedure Results Summary Breadth
15
Jesse A. Fisher Mechanical Option Spring 2005 Riverpark Corporate Center, Phase 1 Salt Lake City, Utah Intro Purpose Procedure Results Summary Breadth
16
Jesse A. Fisher Mechanical Option Spring 2005 Riverpark Corporate Center, Phase 1 Salt Lake City, Utah Intro Purpose Procedure Results Summary Breadth Dedicated Outdoor Air SystemVariable Air Volume System Air Cooled Chiller Water Cooled Chiller Water Cooled Chiller w/ Water Side Economizer Air Cooled Chiller w/ Air Side Economizer Water Cooled Chiller w/ Air Side Economizer Water Cooled Chiller w/ Water Side Economizer Cooling$20,165$12,140$6,325$13,040$7,415$8,450 Heating$10,885 $10,920 Fan Energy$2,200 $8,485 $8,450 Pump Energy$2,250 $1,500 Subtotal$35,500$27,475$21,660$33,945$28,320$29,320 Maintenance$3,735$6,415 $3,735$6,415 Total$39,235$33,890$28,075$37,680$34,735$35,735
17
Jesse A. Fisher Mechanical Option Spring 2005 Riverpark Corporate Center, Phase 1 Salt Lake City, Utah Intro Purpose Procedure Results Summary Breadth Dedicated Outdoor Air SystemVariable Air Volume System Air Cooled Chiller Water Cooled Chiller Water Cooled Chiller w/ Water Side Economizer Air Cooled Chiller w/ Air Side Economizer Water Cooled Chiller w/ Air Side Economizer Water Cooled Chiller w/ Water Side Economizer Cooling$20,165$12,140$6,325$13,040$7,415$8,450 Heating$10,885 $10,920 Fan Energy$2,200 $8,485 $8,450 Pump Energy$2,250 $1,500 Subtotal$35,500$27,475$21,660$33,945$28,320$29,320 Maintenance$3,735$6,415 $3,735$6,415 Total$39,235$33,890$28,075$37,680$34,735$35,735
18
Jesse A. Fisher Mechanical Option Spring 2005 Riverpark Corporate Center, Phase 1 Salt Lake City, Utah Intro Purpose Procedure Results Summary Breadth
19
Jesse A. Fisher Mechanical Option Spring 2005 Riverpark Corporate Center, Phase 1 Salt Lake City, Utah Intro Purpose Procedure Results Summary Breadth Dedicated Outdoor Air SystemVariable Air Volume System Air Cooled Chiller Water Cooled Chiller Water Cooled Chiller w/ Water Side Economizer Air Cooled Chiller w/ Air Side Economizer Water Cooled Chiller w/ Air Side Economizer Water Cooled Chiller w/ Water Side Economizer Chiller$110,000$85,000 $110,000$85,000 Cooling Tower-$30,000 - Water Side Econ--$30,000-- AHU’s$45,000 $136,000 Boiler$20,000 Pumps$20,000 $16,000 Duct Work$100,000 $210,000 Radiant Panels$520,000 --- Baseboard Heat$20,000 --- VAV Boxes---$146,000 Total$835,000$840,000$870,000$638,000$643,000$673,000
20
Jesse A. Fisher Mechanical Option Spring 2005 Riverpark Corporate Center, Phase 1 Salt Lake City, Utah Intro Purpose Procedure Results Summary Breadth Dedicated Outdoor Air SystemVariable Air Volume System Air Cooled Chiller Water Cooled Chiller Water Cooled Chiller w/ Water Side Economizer Air Cooled Chiller w/ Air Side Economizer Water Cooled Chiller w/ Air Side Economizer Water Cooled Chiller w/ Water Side Economizer Chiller$110,000$85,000 $110,000$85,000 Cooling Tower-$30,000 - Water Side Econ--$30,000-- AHU’s$45,000 $136,000 Boiler$20,000 Pumps$20,000 $16,000 Duct Work$100,000 $210,000 Radiant Panels$520,000 --- Baseboard Heat$20,000 --- VAV Boxes---$146,000 Total$835,000$840,000$870,000$638,000$643,000$673,000
21
Jesse A. Fisher Mechanical Option Spring 2005 Riverpark Corporate Center, Phase 1 Salt Lake City, Utah Intro Purpose Procedure Results Summary Breadth Dedicated Outdoor Air SystemVariable Air Volume System Air Cooled Chiller Water Cooled Chiller Water Cooled Chiller w/ Water Side Economizer Air Cooled Chiller w/ Air Side Economizer Water Cooled Chiller w/ Air Side Economizer Water Cooled Chiller w/ Water Side Economizer Chiller$110,000$85,000 $110,000$85,000 Cooling Tower-$30,000 - Water Side Econ--$30,000-- AHU’s$45,000 $136,000 Boiler$20,000 Pumps$20,000 $16,000 Duct Work$100,000 $210,000 Radiant Panels$520,000 --- Baseboard Heat $20,000 --- VAV Boxes---$146,000 Total$835,000$840,000$870,000$638,000$643,000$673,000
22
Jesse A. Fisher Mechanical Option Spring 2005 Riverpark Corporate Center, Phase 1 Salt Lake City, Utah Intro Purpose Procedure Results Summary Breadth Recommendations - Doas Two Ahu’s Fan Coil Units for parallel systems VAV system for parallel system
23
Jesse A. Fisher Mechanical Option Spring 2005 Riverpark Corporate Center, Phase 1 Salt Lake City, Utah Intro Purpose Procedure Results Summary Breadth Recommendations - Vav Supply fan pressure optimization Enthalpy Wheel Demand Controlled Ventilation
24
Jesse A. Fisher Mechanical Option Spring 2005 Riverpark Corporate Center, Phase 1 Salt Lake City, Utah acknowledgements Dr. Jeong Dr. Mumma Davis Mulholand, CCI Ed Newville, CCI Jim Norton, Walton & co Mike Ulsh, Trane
25
Jesse A. Fisher Mechanical Option Spring 2005 Riverpark Corporate Center, Phase 1 Salt Lake City, Utah Questions?
26
Jesse A. Fisher Mechanical Option Spring 2005 Riverpark Corporate Center, Phase 1 Salt Lake City, Utah Intro Purpose Procedure Results Summary Breadth Building Controls 30,000 sf single story office Equipment has been primary focus of research and development can be hard to justify added expenditure potential for savings is quite large
27
Jesse A. Fisher Mechanical Option Spring 2005 Riverpark Corporate Center, Phase 1 Salt Lake City, Utah Intro Purpose Procedure Results Summary Breadth Occupancy sensors $125 / each $8,750 total installed cost Control lights Tie into Building automation system
28
Jesse A. Fisher Mechanical Option Spring 2005 Riverpark Corporate Center, Phase 1 Salt Lake City, Utah Intro Purpose Procedure Results Summary Breadth Lighting four hour reduction in lighting per day 25,000 sf of space controlled by sensors $2,750 annual savings Simple payback of just over 3 years, from lights alone
29
Jesse A. Fisher Mechanical Option Spring 2005 Riverpark Corporate Center, Phase 1 Salt Lake City, Utah Intro Purpose Procedure Results Summary Breadth Demand Controlled ventilation Ashrae stnd 62.1-2004 greater than 50% reduction in ventilation air 4 ton reduction in oa load at design cooling 112 mbtu reduction in oa load at design heating
30
Jesse A. Fisher Mechanical Option Spring 2005 Riverpark Corporate Center, Phase 1 Salt Lake City, Utah Intro Purpose Procedure Results Summary Breadth Occupancy Sensors Exhaust – interlocked with bathroom exhaust Occupied / unoccupied temperature reset scheme
31
Jesse A. Fisher Mechanical Option Spring 2005 Riverpark Corporate Center, Phase 1 Salt Lake City, Utah Intro Purpose Procedure Results Summary Breadth Supply fan pressure optimization Fan outlet - $3,950/yr 2/3 down - $2,950/yr Critical box reset - $2,200/yr
32
Jesse A. Fisher Mechanical Option Spring 2005 Riverpark Corporate Center, Phase 1 Salt Lake City, Utah acknowledgements Dr. Jeong Dr. Mumma Davis Mulholand, CCI Ed Newville, CCI Jim Norton, Walton & co Mike Ulsh, Trane
33
Jesse A. Fisher Mechanical Option Spring 2005 Riverpark Corporate Center, Phase 1 Salt Lake City, Utah Questions?