Overview and Status of The CERN-INFN Collaboration Agreement for R&D Activities Relating to High- Luminosity LHC (HL-LHC) Superconducting Magnets Giovanni Volpini CERN, June 30 th, 2015
2
MAGIX & INFN participation to HL-LHC MAGIX WP1CORRAL Design, construction and test of the five prototypes of the corrector magnets for the HL interaction regions of HiLUMI WP2 PADS 2D & 3D engineering design of the D2 magnets WP3SCOW-2G Development of HTS coil for application to detectors and accelerators WP4SAFFO Low-loss SC development for application to AC magnets MAGIX is a INFN-funded research project, (GrV, «Call») whose goal is to develop superconducting technologies for application to future accelerator magnets. It includes four WP’s, two of which are relevant to HL-LHC 2014-2017, 1 M€ + personnel funds CERN-INFN Collaboration Agreement INFN already involved in FP7- HiLumi (UE-HILUMI, GrV) WP2 beam dynamics, LNF WP3 magnets, MI-LASA WP6 cold powering, MI-LASA 1 2 CERN endorses MAGIX WP1 & WP2 deliverables and milestones, contributing with 527 k€, through the collaboration agreement KE2291/TE/HL-LHC Giovanni Volpini CERN, 30 June 2015
3
The collaboration agreement
4
Giovanni Volpini CERN, 30 June 2015 IR layout IP design WP1 Design, construction and test of the five prototypes of the corrector magnets for the HL interaction regions of HiLUMI, from quadrupole to dodecapole. These magnets will be based on a superferric design. MI, LASA, Giovanni Volpini WP2 Electromagnetic and Mechanical Design, both 2D and 3D, the 2-in-1 separation dipole, «D2», reducing the harmonic multipole components. To deliver an engineering design of the dipole cross section and an overall design of the 3D layout of the magnet cold mass. GE, Pasquale Fabbricatore
5
Economic Plan CostsCERN contribution Personnel521,900 €50%260,950 € Materials for magnet construction 113,000 €75% 84,750 € Costruction & test363,000 €50%181,500 € Travels, lab operation, tooling, R&D activities 305,000 €0% 0 € TOTAL527,200 € 781,000 € WP1 (679k€) + WP2 (102 k€) 93 m.u. (WP1) + 18 m.u. (WP2) (INFN personnel only, no University employees) Payment linked to deliverables Giovanni Volpini CERN, 30 June 2015
6
Giovanni Volpini, CERN 30 June 2015 Schedule
7
Milestones and Deliverables Giovanni Volpini, CERN 30 June 2015 50%
8
The End