Introduction The best foundation for a successful project starts with a comprehensive construction estimate prepared by a group of professional estimators. Estimating requires the ability to prepare quantity surveys, determine labor productivity, price materials and know construction methodologies. Estimating requires experienced, professional estimators knowledgeable in construction practices and procedures. It involves knowledge in civil, architectural, mechanical and electrical disciplines. It includes coordinating these disciplines into a total project scope for a complete, understandable estimate submittal. GUCIERLI has the skilled, experienced professional estimators needed for any estimating effort. As an independent firm, GUCIERLI provides thoroughly researched, unbiased and accurate estimates for the construction industry. and also cost comparison as an International Benchmark such as IPA & Performance Forum.
2
Cost Estimating Services Scope Of Services Scope Of Services Tool and Benchmarking Tool and Benchmarking Product Of Services Product Of Services Project Experiences (Hydrocarbon/Oil & Gas) Project Experiences (Hydrocarbon/Oil & Gas) Project Experiences (Non-Hydrocarbon) Project Experiences (Non-Hydrocarbon) Cost Of Services Cost Of Services Term Of Payment Term Of Payment Your Benefit Your Benefit Contact us Contact us
3
Scope Of Services Hydrocarbon / Refinery ( Oil and Gas ) Pipeline ( Onshore / Offshore ) Mineral and Infrastructures Power Plant and Power Distributions High Rise Building Food and Beverages General Industries
4
Tool and Benchmarking TOOLS – QUE$TOR, Ver.2012-Q3 – Excel Spreadsheet BENCHMARKING – IPA (Independent Project Analysis) – PERFORMANCE FORUM – MSS ( Market Survey System) from ODS Petrodata / IHS
5
Product of services Conceptual / Screening Feasibility Study Definitive Comparison / Analysis Modeling based on Tool
6
Project Experiences Hydrocarbon (Oil & Gas) Offshore Pipeline – 10 Km Offshore Pipeline – 110 Km Onshore Pipeline – 120 km ORF – East Java ORF - Batam Wellhead Platform – Irian Jaya Wellhead Platform – Madura Sea Subsea Facility 2000 Meter Water Depth Etc Santos PETRONAS ConocoPhillips Santos PETRONAS ConocoPhillips BP Tangguh PETRONAS
7
Project Experiences Non – Hydrocarbon Nickel Mine Infrastructure Nickel Process Plant Nickel Mine Infrastructure Coal Mine Infrastructure Coal Bed Methane Ammonium Nitrate Plant Public Water Treatment Plant Food and Beverages High Rise Building Etc SOLWAY BHP Billiton BANPU SHELL ORICA Government NESTLE Various
8
Cost Of Services Minimal 3.000 USD for every 100 Mil USD Project Value and add 150 USD every >100 Mil USD Project Value. (Net) 15 USD for Additional Item/Revision/Comments Minimum 500 USD/Equipment for procurement Support in Definitive stage (only)/FEED/FEL-3 if Equipment price not Provided. 5.000 USD/Development Modeling/Que$tor Modeling, and add 500 USD for each special /specific Modeling Items.
9
Term of Payment 15% Commitment fee Add 75% Payment for first Issue (IFC) Add 5% Payment for second Issue (IFA) Add 5% Payment for last Issue (AFD) Note : IFC: Issued For Comments IFA: Issued For Approved AFD: Approved For Development
10
Your Benefit Not need to Hire Employee/Contract, Etc. Not need to provide Office Furniture Not need to Provide IT/PC infrastructure Not need to use/rent Special Software Not Need Office Space and Consumables Etc.