Presentation is loading. Please wait.

Presentation is loading. Please wait.

Hall A Installation Review John J. LeRose 2/25/2009.

Similar presentations


Presentation on theme: "Hall A Installation Review John J. LeRose 2/25/2009."— Presentation transcript:

1 Hall A Installation Review John J. LeRose 2/25/2009

2 “Installation” work for 12GeV in Hall A Arc dipole calibration extension Møller upgrade to handle 11 GeV Beam Compton upgrade to handle 11 GeV Beam

3 Thomas Jefferson National Accelerator Facility Page 3 Leave the magnets and mapper alone Just upgrade the arc dipole magnets power supply Cross calibrate 8 arc dipoles and the 9 th using the unmodified mapper* * http://www.jlab.org/~lerose/12GeV/TN-08-005.pdfhttp://www.jlab.org/~lerose/12GeV/TN-08-005.pdf WBS 1.4.1.5 BEAMLINE - ARC Energy Measurement

4 Thomas Jefferson National Accelerator Facility Page 4 Add quadrupole Q1’ New field-exclusion insert Raise detector by 100 mm WBS 1.4.1.5 BEAMLINE - Møller Polarimeter

5 Thomas Jefferson National Accelerator Facility Page 5 11 GeV upgrade builds on 6 GeV changes (infrared to green laser) Raise D2, Optical Cavity, Photon Detector, & D3 by 82 mm Rebuild vacuum line Add motion mechanism to electron detector WBS 1.4.1.5.2 BEAMLINE - Compton Polarimeter Done

6 Thomas Jefferson National Accelerator Facility Page 6 WBS 1.4.1 Construction Schedule FY2009FY2010FY2011FY2012FY2013FY2014 123412341234123412341234

7 Thomas Jefferson National Accelerator Facility Page 7 Arc Energy Calibrations Schedule and Manpower Calibration effort involves multiple moves of the 8 arc dipoles interchanging with the 9 th magnet. Time/Manpower Estimate: Work begins Q3 FY 11 (6 mo “down before the down”) 2011 Electrical Technician2 MW Mechanical Technician15 MW Staff Scientist12 MW Paid University Staff12 MW Paid University Students15 MW

8 Thomas Jefferson National Accelerator Facility Page 8 Møller Manpower and Schedule Bulk of the work is done in 2012 with some trickle over into 2013 Time/Manpower Estimate: 20122013 Electrician1 MW Electrical Tech1 MW Staff Scientist3 MW1 MW Computer Scientist1 MW Visiting Users3 MW1 MW

9 Thomas Jefferson National Accelerator Facility Page 9 Compton Manpower and schedule Preliminary work starts in 2011 with the bulk in 2012 and some trickle over into 2013 201120122013 Electrician3 MW1 MW Electrical Technician1 MW2 MW1 MW Mechanical Technician21 MW7 MW Staff Scientist3 MW5 MW2 MW Paid University Staff2 MW 1 MW Paid University Students4 MW5 MW1 MW

10 Thomas Jefferson National Accelerator Facility Page 10 Detailed Schedules Compton/Møller http://www.jlab.org/~lerose/12GeV/installation/Hall_A_12_Gev_upgrade_present.pdf Arc Magnet Calibration http://www.jlab.org/~lerose/12GeV/installation/HallA_12_Gev_upgrade_Ark_Magnets.pdf