Download presentation
Presentation is loading. Please wait.
Published byAlvin Lewis Modified over 9 years ago
1
AMERICAN SAMOA AIP PROJECTS IN HAND ARFF STATION PAGO PAGO ARFF STATION PAGO PAGO HOT FIRE TRAINING FACILITY FOR PAGO PAGO HOT FIRE TRAINING FACILITY FOR PAGO PAGO ARFF STATIONS FITIUTA AND OFU ARFF STATIONS FITIUTA AND OFU RAPID INTERVENTION VEHICLE PROVISIONING FOR PAGO PAGO,FITIUTA AND OFU RAPID INTERVENTION VEHICLE PROVISIONING FOR PAGO PAGO,FITIUTA AND OFU APRON PAVEMENT CONSULTANCY FOR PAGO PAGO APRON PAVEMENT CONSULTANCY FOR PAGO PAGO ENVIRONMENTAL ASSESSMENT STUDY FOR OFU ENVIRONMENTAL ASSESSMENT STUDY FOR OFU
2
ARFF STATION PROGRESS AT 4/1/05 Overall project 68% complete Overall project 68% complete Main vehicle room and floor drains complete Main vehicle room and floor drains complete Concrete roof to courtyard complete Concrete roof to courtyard complete Mechanical and electrical installation continuing Mechanical and electrical installation continuing Painting of main vehicle room continuing Painting of main vehicle room continuing
3
ARFF PROJECT PAGO PAGO INTERNATIONAL AIRPORT POURING OF ROOF SLAB Pouring of Final Roof Slab
4
ARFF PROJECT PAGO PAGO INTERNATIONAL AIRPORT Accommodation Area
5
ARFF PROJECT PAGO PAGO INTERNATIONAL AIRPORT FRONT OF STATION HIGHLIGHTING THE OFFICE AREAS
6
ARFF PROJECT PAGO PAGO INTERNATIONAL AIRPORT EASTERN END OF THE STATION SHOWING THE ENTRY TO THE RECEPTION AREA
7
ARFF PROJECT PAGO PAGO INTERNATIONAL AIRPORT ENGINE BAY Engine Bay
8
STATION REAR STATION REAR ARFF PROJECT PAGO PAGO INTERNATIONAL AIRPORT Rear of Station
9
ARFF PROJECT PAGO PAGO INTERNATIONAL AIRPORT STATION DISPATCH AND ENGINE BAYS NOTE THE SHUTTERS IN THE ENGINE BAY DESIGNED FOR VENTILATION AND TO DEFLECT HURRICANE FORCE WINDS
10
NOAA WEATHER STATION State of the Art Hurricane Proofed Weather Facility
11
HURRICANE OLAF FITIUTA
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.