TPC Collaboration Meeting 2-3.9.02Peter Glassel 1 Reminder on Installation Schedule (ALICE Forum June 2002) Install Muon magnet directly into experimental hall in temporary position No pre-installation of magnet, absorber, Muon filter, Muon chambers in SXL2 Assembly of absorber at Point 2 Assembly line in SX2 – if agreement with Sarov No displacement of TPC and clean-room Keep clean room in SXL2 Installation of TPC / ITS / Vacuum chamber This installation has a duration of 6 months and is regarded as a block We assume that no other activity can proceed in parallel TDR / TOF / PHOS have two installation periods Period 1: Before TPC/ITS/Va Period 2: After the installation of TPC/ITS/Va (Vacuum chamber in place)
2
TPC Collaboration Meeting 2-3.9.02Peter Glassel 2 Installation Phases Phase 1 now – 01.06.2005 Large structures for Muon arm Phase 201.06.2005 – 01.05.2006 TRD/TOF/PHOS/HMPID Phase 301.05.2006 – 01.11.2006 TPC/ITS/Vacuum Phase 401.11.2006 – 01.04.2007 Commissioning PMD and FMD, V0, T0, Si3 on RB24 side Last TOF modules Shielding / machine interface / close L3 magnet etc
3
TPC Collaboration Meeting 2-3.9.02Peter Glassel 3 Installation of detectors into space-frame Installation shaft 7 x 15 m2 Working position outside the magnet Installation in the space-frame 1 st Period; outside / inside the L3 magnet 2 nd Period; after TPC/ITS/Va installation
4
TPC Collaboration Meeting 2-3.9.02Peter Glassel 4 Installation mile stones Close L3 magnet back door Best guess to-day is beginning of 2004 Installation of space-frame In the new planning the space-frame is moved from SXL2 and installed in the experimental area in June 2005 I.e. pre-installation testing in SXL2, involving the space-frame, must end at this date