Download presentation
Presentation is loading. Please wait.
Published byAlexandrina Richards Modified over 8 years ago
1
Canadian Light Source Commissioning Progress CLS Annual Users Meeting – 2003-11-15
2
22003 November 15 Facility Layout
3
32003 November 15 Booster Commissioning Blue: Dipole Field Yellow: PCT average current – 8 mA Green: FCTpeak current – 40 mA injected, 20 mA extracted
4
42003 November 15 CLS Storage Ring 2.9 GeV DBA lattice with 12-fold period 170.88 m circumference Nominal Tune: x = 10.22 y = 3.26 E loss per turn: > 0.876 MeV Bend magnet radiation: c = 1.6 Å E c = 7.6 keV x (natural damped) = 18.1 nmrad Damping times: x = 2.4 ms, y = 3.8 ms, E = 2.7 ms ~10 mm bunch length
5
52003 November 15 Typical Storage Ring Sector
6
62003 November 15 Split Sector Magnets
7
72003 November 15 Sector Vacuum Chamber
8
82003 November 15 Vacuum Bake-out
9
92003 November 15 Superconducting RF Cavity
10
102003 November 15 Storage Ring Injection & RF
11
112003 November 15 Storage Ring Sector
12
122003 November 15 Storage Ring
13
132003 November 15 Storage Ring Straight
14
142003 November 15 Commissioning Plan 4-week Runs: 2 installation + 2 run –Started 2003 September –Initial sequence: First turn Stored beam Stacked beam Vacuum conditioning Radiation survey for licensing –Goal: 100 mA > 6 hour lifetime Good reliability and stability
15
152003 November 15 Storage Ring Commissioning – Run 1 Yellow: Storage Ring current at injection septum Measured on 2003-09-26
16
162003 November 15 Storage Ring Commissioning – Run 2 Green: Storage ring current Measured 2003-10-25
17
172003 November 15 Storage Ring Commissioning – Run 3 Green: Booster beam Pink: SR1 beam loss measured by CBLM Measured 2003-11-14
18
182003 November 15 Plan for 2004 Q1: –SGM/PGM front-ends, POE and IDs –Optical chicanes for IR lines –Start of day-time operation Q2: –SM and PX front-ends, POEs and IDs –XAFS front-end and POE Q3: –XAFS wiggler –Tentative start of 24-hour operation Q4: –Increase current to 200 mA and lifetime to ~10 h
19
192003 November 15 Future Projects Modifications for top-up operation Fast transverse feedback Linac modifications/upgrade Come to Sunday session to discuss other long range possibilities
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.