Download presentation
Presentation is loading. Please wait.
Published byCarmella Berry Modified over 9 years ago
1
8/3//01 NATO CCMS Pilot Study on Prevention and Remediation in Selected Industrial Sectors Approved by CCMS Plenary fall 2002 Three year study (2003-2006) Focus on single industrial sector each meeting Deal with prevention of contamination as well as monitoring and cleanup issues Limit meetings to three days Restrict Tours de Table in order to meet time limit Site visit optional depending on the agenda
2
8/3//01 Prevention and Remediation in Selected Industrial Sectors (cont.) Topics to be discussed at meetings could include: Risk assessment approaches Monitoring and characterization Prevention strategies Remediation strategies Industry best practices overview Redevelopment practices and technologies Future outlook for the sector
3
8/3//01 Prevention and Remediation in Selected Industrial Sectors (cont.) Documentation and information transfer very important –Immediate availability of meeting results to country reps –Web site following meeting –Short report of abstracts and CD of all past meetings sent to each country rep Topics/Meetings –Non-ferrous mining—Baia Mare, Romania, Sept. 2003 –Rehabilitation of old landfills—Cardiff, Wales, May 2004 Discussion on Tuesday of length of Pilot Study and next meetings
4
8/3//01
5
Industry/Other Sector Candidates for Future Meetings Non-ferrous mining Completed Chemical production - organic Privatization Issues Rehabilitation of old landfills Completed MGP/gasworks Chemical fertilizer mfg/use "Mega sites" Possible 2005 Sediment sites Smelting/refining Gas station sites Oil refining Possible 2006 Pesticide mfg/formulation/application Chemical production - inorganic Metal finishing Mixed hazardous and radioactive waste sites
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.