WMO RESPONSES OF WMO TECHNICAL COMMISIONS TO WIGOS IMPLEMENTATION Progress of WIGOS activities within Technical Commissions (Bertrand Calpini, co-Chair, ICG-WIGOS) WMO; OBS
2
Review progress in regional WIGOS plans and their preparedness for implementation Explore and resolve challenges at regional level Explore how RA's can assist in national WIGOS planning and preparedness Review progress and issues of technical commissions in relation to WIGOS Integration of WIGOS in TC work plans Explore how technical commissions can work together in implementing WIGOS 2 Objectives of ICG-WIGOS-2 (slide #14, Sue)
3
WMO Outline approach and progress within the TCs responding to the WIGOS Framework Implementation Plan (WIP) approved by EC-64. contribution of other TCs vs CBS and CIMO In each TC: WIGOS implementation vs TC Specific activities in TC WIGOS challenges for the TC
4
WMO CIMO vs WIGOS WIGOS implementation vs CIMO Restructured CIMO in 2010 vs anticipated key WIGOS implementation activities In response to Actions 1.1.2 (working structure), 6.1.1(standards, best practice vs methods of observation), and 8.1.1 (Metadata Standards), CIMO MG-10 reviewed its OPAG/ET Review the CIMO ToRs of each ET (done: ET- Standardisation, ET New In-Situ Technologies, ET- New Technologies and Test Beds)
5
WMO CIMO vs WIGOS WIGOS specific activities in CIMO CIMO Editorial Board in TT-WRM: review of the the CIMO Guide to separate guidance from mandatory material. ISO: Ground based wind Doppler lidar Siting classification for surface obs stations on land Sustained classification Intercomparisons: SPICE, Weather Radar, rain fall intensity measurement (CEN norm)
6
WMO CIMO vs WIGOS WIGOS challenges for the CIMO Limited number of experts in CIMO CIMO position vs: Role of TT in WIGOS: addresses issues relevant to «most of» the TCs, work under ICG WIGOS Role of TCs: addresses issues relevant at first to the specific TC, with contribution after the inital output is drafted CIMO experts’ engagement «on demand» mode vs specific issues.issue.
7
www.wmo.int Thank you for your attention www.wmo.int/wigos