Presentation is loading. Please wait.

Presentation is loading. Please wait.

Seals Patented Installation System Working Area Preparation ( Step by step )

Similar presentations


Presentation on theme: "Seals Patented Installation System Working Area Preparation ( Step by step )"— Presentation transcript:

1 Seals Patented Installation System Working Area Preparation ( Step by step )

2 You need the following : * 1 seal jig * 1 adapted installation tool * 1 glue roller

3 Seal jig : seal jig is designed to work on all A4 seals You can ajust seals on left side… … or right side… if you turn the jig over…

4 Adapted installation tool : 2 tools exist, one for HP 1010 / 1200, one for AX / HP 1320 AX one is wider than HP 1200 one….

5 Glue roller : is really inexpensive, use Pritt permanent glue

6 First step : Place seal jig in front of you Place seals on the jig

7 Second step : Take glue roller and place glue on bottom both ends of the tool ( 2 cm ) plus 2-3 cm in the middle pasting the tool Tool has to be sticky enough to hold the seal, But less sticky than seal’s adhesive, otherwise, seal will not stick on hopper and will stay on the tool….

8 Third step : Place the insertion toll on the seal, Using jig and handle as guides

9 Then….. Act as shown on my video… If you do not see the video, please look at www.proton.fr home page….. www.proton.fr

10 Always replace installation toll on next seal : !! Important Tip !! * In this case, one gluing operation can last a full work day * You are saving few more time on production operations * Tooling will last much longer without anymore maintenance

11 Has been proud to show you it’s french patented sealing system…..


Download ppt "Seals Patented Installation System Working Area Preparation ( Step by step )"

Similar presentations


Ads by Google