Presentation is loading. Please wait.

Presentation is loading. Please wait.

Status on the HYDE project Collaboration: University of Huelva, Spain (coordinator) GSI-Darmstadt, Germany. University of Sevilla, Spain. CSIC-IEM Madrid,

Similar presentations


Presentation on theme: "Status on the HYDE project Collaboration: University of Huelva, Spain (coordinator) GSI-Darmstadt, Germany. University of Sevilla, Spain. CSIC-IEM Madrid,"— Presentation transcript:

1 Status on the HYDE project Collaboration: University of Huelva, Spain (coordinator) GSI-Darmstadt, Germany. University of Sevilla, Spain. CSIC-IEM Madrid, Spain. IKS-University of Leuven, Belgium. CRC Louvain la Neuve, Belgium. A. Soltan Institute for Nuclear Studies, Warsaw, Poland. H. Niewodniczandki Institute of Nuclear Physics PAN, Krakow, Poland. Present support: FAZIA collaboration CEA-Saclay

2 Physics at 3-20 MeV/u  should we include up to 100 MeV/u??: - Direct Nuclear Reactions, Clustering, Fusion Evaporation, Deep Inelastic, etc. The HYDE concept Status and perspectives 2006-2008: - Preliminary concept design. - Simulations GEANT4. - Status and funding.  E 1  E 2 E Detection techniques: -  E 1 : gas/monolithic Si-10  m. -  E 2 : DSSD 40  m. - E : Single PAD 2 mm. - Pulse shape analysis. - Time of flight. HYDE Goals: - Charged particles. - Good charge and mass identification. - Efficiency (>60%). - Good energy resolution (<300 keV). - Angular resolution (<2º). Beam: - Large emitance > 20  mmmrad. - Low intensity <10 7 pps.

3 Preliminary concept design - Handy design  modular system 600mm ? 300mm AGATA chamber Target

4 0 10 20 30 40 50 60 E total / MeV 1H+1H+ 0 2 4 6 8 10 12 14 16 18 20 E DSSSD / MeV 4 He 2+ 6 Li 3+ 9 Be 4+ 10 20 30 40 50 0 10 20 30 40 50 60 0 2 4 1H+1H+ 4 He 2+ 6 Li 3+ 9 Be 4+ 6 8 10 E total / MeV 12 14 16 18 20 E DSSSD / MeV 10 20 30 40 50 Simulations GEANT4 = 5 MeV/u  E FWHM = 3 MeV/u  = 20  mm mrad  x,y FWHM = 3 cm Track1 DSSSD (40  m) Track2 DSSSD (40  m) + PAD (2 mm)  scattering = 30°  FWHM = 2 ° 2 m 208 Pb 1 mg/cm 2 3.1% 1 H + 11.1% 4 He 2+ 10.7% 6 Li 3+ 12.9% 9 Be 4+ at the target 1 m

5 PRESENT STATUS  Materials por Charge Particle identification, position sensitive (up to 100 MeV/u ?): Solid state detectors  Si + CsI Pulse shape analysis  beyond S, Cl Gas detectors: HYDE/Tracking CEA/Saclay- E.C. Pollaco Diamond monocristal  GSI ??  Simulations  D. Rodríguez (Physics, LPC Caen /Univ. Huelva)  Technical: Mechanics & design: J.A. Bernal (Engineer, C.N.A collaboration, Sevilla) F. Pizarro (Engineer, DFA, Univ. Huelva) Electronics& DACQ: R. Berjillos (Engineer, DFA, Univ. Huelva) J.L. Flores (Physics, DIEISA, Univ. Huelva) COLLABORATION: SCHOOL OF ENGINEERS (UHU) FAZIA Collaboration R. Bougault /LPC-Caen HYDE: R&D STAGE 2006-2007

6 HYDE DETECTOR: Current period 2006: - Materials/Instruments/Travelling: about 20 k€ from present running projects -1 year contract for electronic engineer (Spanish Research Council-MEC) Period 2007-2009: Application to Spanish Research Council (MEC) (HUELVA & SEVILLA) 1)Pulse shape analysis 2)Detector materials 3) Development of tracking detectors 4) Related experiments and collaborations - Materials/Traveling: 160 k€ / - Man power: 210 k€ /3 years contract for: 1 Engineer 1 Postdoc 1 PhD student. LOW ENERGY TRACKING: Current period 2006: -1 Postdoc (physics) - Experiments at Tandem with present equipment are foreseen for 2006. Period 2007-2009: Application to Spanish Research Council (MEC) (SEVILLA & HUELVA): 1) Construction of a beam line for low energy tracking 2) Related experiments and collaborations - Materials/Travelling: 150 k€ -Man power: 210 k€ /3 years contract for: 1 Engineer 1 Postdoc 1 PhD student R&D STAGE 2006-2007/FUNDING


Download ppt "Status on the HYDE project Collaboration: University of Huelva, Spain (coordinator) GSI-Darmstadt, Germany. University of Sevilla, Spain. CSIC-IEM Madrid,"

Similar presentations


Ads by Google