NYS-DOT REGION 6 ROAD PROTECTION FOR ROUTE 248 CHENUNDA CREEK, SOUTH OF WELLSVILLE, NY. CONSTRUCTED AS A HANDS-ON WORKSHOP SEPTEMBER 2006
2
Pix by Derrick
3
POC: Sandra Rapp, New York State DOT work 607-324- 8527 srapp@dot.state.ny.ussrapp@dot.state.ny.us RRD/Derrick Tasks: * Performed a fluvial geomorphology analysis * Developed alternative designs, developed the final design * Reviewed Plans & Specs, many discussions with DOT hydraulic engineers!! * Provided construction oversight & taught a hands-on workshop to 88 of NYS DOT’s finest
4
Stream Project Functions: Fully functioning both hydraulically & environmentally. Multiple protection redundancy. LPSTP provides direct armor protection. Bendway Weirs Locked Logs, & J- Hook move scour & thalweg away from attacked bank, with velocities reduced on outer bank. Vegetation roughness reduces near-bank flow velocities & provides a functioning riparian corridor. Roots strengthen bank & bind soil. Grade Control structure stops upstream headcut migration.
5
Planview-Looking US at Reach 1 FROM DAN SABOL, NYS-DOT
6
Pre-project conditions
7
Chenunda Creek @ Rt. 248. Pre- project condition Mar 22, 2006. Looking US at the eroding bend. Pix from Joe Galati
8
Chenunda Creek @ Rt. 248. Pre-project conditions 7/25/2006. Looking DS at the eroding left bank Pix by Derrick
9
The Upstream Key
10
Construction 9/19/2006. Looking US. Hoe placing big stone (DOT heavy) in US keyway Pix by Derrick
11
Construction 9/20/2006. Looking DS at angle of key to stream flow Pix by Derrick Flow Key angle
12
STREAM BED & BANK STABILIZATION METHODS USED Choked & vegetated LPSTP with vegetated keys, & curved US & DS keys J-Hook Vane Short Bendway Weirs Pre-dug & Over-dug pool with Locked Logs and Instant Shade Joint Plantings, Live Siltation, Pole Plantings, Slit Trench Plantings, Instant Shade, RPM Trees & Shrubs Hydraulic Cover Stones Traffic Control Stones (Upstream) Thalweg Control Stones Engineered Rocked Riffle Grade Control Structure (all stones in compression) with an integrated fish ladder on the downstream face
13
Construction 9/20/2006. A dump truck load level full of Sandbar & Streamco Willow, & Ruby Redosier dogwood, (1,500 total) from the NRCS Plant Material Center, Big Flats, NY. Now that is a truckload!!! Pix by Derrick
14
Construction 9/21/2006. Looking US at trench stone & bundled willows Pix by Derrick
15
Short Bendway Weirs spaced on 50 ft intervals
16
Construction 9/21/2006. Looking US @ toe-down stone toe & short Bendway Weir (2 people standing on Weir) Pix by Sandra Rapp
17
Construction 9/20/2006. Looking US @ short Bendway Weir & pre-dug thalweg Pix by Martin Vandergrinten NRCS Plant Material Center
18
Mid-Project Soil-Choked Stone Key with Vegetation
19
Construction 9/19/2006. Digging a key into bank. Some willow poles in place Pix by Derrick
20
Construction 9/19/2006. Looking at key Pix by Derrick
21
Construction 9/21/2006. Workshop participants adding more veg to soil-choked key Pix by Derrick
22
Construction 9/21/2006. Looking DS, digging the J-Hook Vane pool Pix by Derrick
23
Construction 9/2006. Looking US at Locked Logs in J-Hook pool. Pix by Martin Vandergrinten NRCS Plant Material Center
24
Construction 9/2006. Looking US at Locked Logs & Instant Shade Pix by Martin Vandergrinten NRCS Plant Material Center
25
Construction 9/21/2006. The Root Production Method (RPM) Plants Pix by Derrick
26
Post Construction 9/30/2006. Looking US. All plants, including the RPM plants in place Pix by Joe Galati-NYS DEC
27
THE PROJECT IS COMPLETE, LET’S ROLL A LITTLE WATER THROUGH IT
28
HIGH FLOW TWO MONTHS AFTER CONSTRUCTION Photos by Sandra Rapp, NYS-DOT REGION 6 NOVEMBER 19, 2006
29
High water 11/19/2006. Looking DS at project bend, note thalweg in center of the channel Pix by Sandra Rapp US key here
30
WINTER WONDERLAND FOUR MONTHS AFTER CONSTRUCTION JANUARY 9, 2007
31
Post Construction 1/9/2007. Looking US at project bend. Note calm water near bank Pix by Derrick
32
. LOW LOW LOW FLOW 13 MONTHS AFTER CONSTRUCTION Photos by Dave Derrick OCTOBER 15, 2007
33
13 Months LATER-low flow. Veg in key is robust. Pix by Derrick 10/15/2007
34
13 Months LATER-low flow. Looking DS, upper bank veg is robust. Pix by Derrick 10/15/2007
35
BIG THAW PLUS RAIN = HIGH STAGES Feb 6, 2008
36
Looking DS @ project bend, flow in diversion channel to right Pix by Earl Flint DOT - 2/6/2008
37
Looking DS @ into project bend Pix by Nancy Root - 2/6/2008
38
Looking US. Flow over J-Hook near tip of arrow Pix by Nancy Root - 2/6/2008
39
Looking US @ project bend. Everything looks in order. Pix by Nancy Root - 2/6/2008
40
Looking US @ DS end of project bend. Good transition into DS bend Pix by Earl Flint DOT - 2/6/2008
41
22 MONTHS AFTER CONSTRUCTION Photos by Joe Galati NYSDEC JULY 10, 2008
42
Looking US @ the US section of the project & the TCS section of the project 22 MONTHS AFTERCONSTRUCTION-CHENUNDA CR.-PIX BY JOE GALATI 7-10-2008
43
Looking US @ a well vegetated stable bank 22 months after installation 22 MONTHS AFTERCONSTRUCTION-CHENUNDA CR.-PIX BY JOE GALATI 7-10-2008
44
Looking US @ J-hook, veg growth & stable bank 22 months after installation 22 MONTHS AFTERCONSTRUCTION-CHENUNDA CR.-PIX BY JOE GALATI 7-10-2008
45
Looking US @ veg & stable bank 22 months after installation. 22 MONTHS AFTERCONSTRUCTION-CHENUNDA CR.-PIX BY JOE GALATI 7-10-2008
46
From the DS end of the project looking US 22 months after installation 22 MONTHS AFTERCONSTRUCTION-CHENUNDA CR.-PIX BY JOE GALATI 7-10-2008
47
4YEARS AFTER CONSTRUCTION Photos by Joe Galati NYS-DEC (retired) AUGUST 25, 2010
48
4 YEARS LATER-Looking DS into the upper end of the bend. 4 YEARS LATER-CHENUNDA CR.-PIX BY JOE GALATI 8-25-2010
49
4 YEARS LATER-Looking @ “J” section of the J-Hook. 4 YEARS LATER-CHENUNDA CR.-PIX BY JOE GALATI 8-25-2010
50
4 YEARS LATER-Looking US @ the J-Hook & DS pool. 4 YEARS LATER-CHENUNDA CR.-PIX BY JOE GALATI 8-25-2010
51
4 YEARS LATER-Looking US @ the J-Hook & DS pool. 4 YEARS LATER-CHENUNDA CR.-PIX BY JOE GALATI 8-25-2010
52
4 YEARS LATER-Looking US. Close-up of the J-Hook & pool. 4 YEARS LATER-CHENUNDA CR.-PIX BY JOE GALATI 8-25-2010
53
4 YEARS LATER-Looking US @ the bend DS of the J-Hook. 4 YEARS LATER-CHENUNDA CR.-PIX BY JOE GALATI 8-25-2010
54
4 YEARS LATER-Looking US @ lower end of the bend. 4 YEARS LATER-CHENUNDA CR.-PIX BY JOE GALATI 8-25-2010
55
4 YEARS LATER-From top bank looking US @ stream’s attack angle into project bend. Dense lush vegetation on bank. 4 YEARS LATER-CHENUNDA CR.-PIX BY JOE GALATI 8-25-2010
56
4 YEARS LATER-Looking DS @ exit out of the project bend. 4 YEARS LATER-CHENUNDA CR.-PIX BY JOE GALATI 8-25-2010
57
4 YEARS LATER-Looking DS @ ERR with integrated fish ladder 4 YEARS LATER-CHENUNDA CR.-PIX BY JOE GALATI 8-25-2010
58
4 YEARS LATER-Looking DS @ the ERR. Fish ladder on left. 4 YEARS LATER-CHENUNDA CR.-PIX BY JOE GALATI 8-25-2010
59
4 YEARS LATER-Looking US @ the ERR. 4 YEARS LATER-CHENUNDA CR.-PIX BY JOE GALATI 8-25-2010
60
4 YEARS LATER-Looking US @ fish ladder on the the ERR. 4 YEARS LATER-CHENUNDA CR.-PIX BY JOE GALATI 8-25-2010
61
TRAFFIC CONTROL STONES & LIVE STAKES UPSTREAM OF THE MAIN PROJECT
62
Construction 9/22/2006. Far US end of project, Traffic Control Stones with Live Stakes on left bank. Pix by Derrick
63
Construction 9/22/2006. Joe Galati installing Live Stakes around a Traffic Control Stone. Stones are half-buried. Pix by Derrick
64
Construction 9/22/2006. Joe G. happy with the Live Stakes & the Traffic Control Stones Pix by Derrick
65
Construction 9/22/2006. Close-up of a Traffic Control Stone & Live Stakes Pix by Derrick
66
5/31/2007. 8 months later. Looking at Live Stakes & Traffic Control Stones Pix by Sandra Rapp
67
Pix by Derrick 10/15/2007 13 Months LATER. Looking @ Traffic Control Stone & Live Willow Stakes
68
Looking @ the same two TCS 22 months after installation 22 MONTHS AFTERCONSTRUCTION-CHENUNDA CR.-PIX BY JOE GALATI 7-10-2008
69
13 Months LATER. Note stable bank landward of the TCS Pix by Derrick 10/15/2007
70
Close-up of a single TCS with willow stakes. 22 MONTHS AFTERCONSTRUCTION-CHENUNDA CR.-PIX BY JOE GALATI 7-10-2008
71
Pix by Derrick 10/15/2007 13 Months LATER. Looking @ 3 Traffic Control Stones
72
TCS & willow stakes 22 months after installation. Effective bank stabilization. 22 MONTHS AFTERCONSTRUCTION-CHENUNDA CR.-PIX BY JOE GALATI 7-10-2008
73
4 YEARS LATER-Looking @ LDB Traffic Control Stones & willow 4 YEARS LATER-CHENUNDA CR.-PIX BY JOE GALATI 8-25-2010
74
RECAP
75
PRE-PROJECT-Looking DS @ the project bend. PRE-PROJECT-CHENUNDA CR.-PIX BY JOE GALATI 2006
76
4 YEARS LATER-Looking DS @ the project reach. Channel is stable with dense plant growth on bank. Willows along toe of bank are robust. 4 YEARS LATER-CHENUNDA CR.-PIX BY JOE GALATI 8-25-2010
77
DAN SABOL BROUGHT HIS DOG TO SEE THE PROJECT!
78
CLEOPHUS SPEED ELVIS DERRICK. We are in the driver’s seat now!!