M. Brooks, 16-Dec-00 Muon Collaboration Meeting North FEE Schedule Assume installation in 2002 shutdown, June-October(?), gives 1.5 years to complete pre-installation.

Similar presentations


Presentation on theme: "M. Brooks, 16-Dec-00 Muon Collaboration Meeting North FEE Schedule Assume installation in 2002 shutdown, June-October(?), gives 1.5 years to complete pre-installation."— Presentation transcript:

1 M. Brooks, 16-Dec-00 Muon Collaboration Meeting North FEE Schedule Assume installation in 2002 shutdown, June-October(?), gives 1.5 years to complete pre-installation work Given uncertainty in future shutdowns and desire to allow longer delivery times to maintain costs, want to start as much of FEE work now as possible, and do as much advance work as possible Previous estimate was that installation would require ~2 months, assuming all assembly and testing was done PRIOR to shutdown

2 M. Brooks, 16-Dec-00 Muon Collaboration Meeting North FEE Work FEMs: chassis --LANL/NMSU CROC Control Boards French Collaborators Backplanes Copper Fiber translators -- LANL Calibration system -- LANL LV Distribution -- UNM Slow Controls -- NMSU Mechanical support structure -- LANL/NMSU Rack Layout and Int. -- LANL Cable layout -- LANL FEM Assembly into CRAs -- French? FEE Installation -- Everyone LANL: M. Brooks, M. Leitch, P. Mcgaughey, G. Hart, J. Archuleta, B. Archuleta, J. Boissevain NMSU: S. Pate, G. Moran, PSL UNM: D. Fields, N. Bruner }

3 M. Brooks, 16-Dec-00 Muon Collaboration Meeting North FEE Work Status FEMs: chassis --Design complete, money transfer to NSMU for fab underway, Greg Moran expects to start fab in January CROC Control Boards Albert will give Backplanes Copper Fiber translators -- SOW submitted to purchase in route to LANL. Greg Hart has agreed to take care of ordering parts, boards (again). Already looking into alternatives for very poorly constructed cables. Calibration system -- SOW submitted to purchase in route to LANL. M. Leitch, P. McGaughey will oversee LV Distribution -- SOW for purchase at UNM submitted Slow Controls -- Will probably buy modules through BNL Mechanical support structure -- Design work underway. Expect to be completed in January. Design will then go to NMSU for fab. Money for fab already in route to NMSU. Rack Layout and Int.-- Will look at with Jan soon Cable layout-- LANL FEM Assembly into CRAs -- French? FEE Installation -- Everyone }


Download ppt "M. Brooks, 16-Dec-00 Muon Collaboration Meeting North FEE Schedule Assume installation in 2002 shutdown, June-October(?), gives 1.5 years to complete pre-installation."