Presentation is loading. Please wait.

Presentation is loading. Please wait.

NSRS Update Recent NERC Standards Activities RSC – June 2013 Presented by: Lisa Martin, NSRS Chair.

Similar presentations


Presentation on theme: "NSRS Update Recent NERC Standards Activities RSC – June 2013 Presented by: Lisa Martin, NSRS Chair."— Presentation transcript:

1 NSRS Update Recent NERC Standards Activities RSC – June 2013 Presented by: Lisa Martin, NSRS Chair

2 2 NSRS Recent Activity ●Teleconferences Conducted  April 8, 22  May 6, 20  June 3, 17 ●Upcoming Scheduled Teleconferences  July 8, 22  August 5, 19 RSC Meeting June 26, 2013

3 3 NSRS Highlights ●Ballot/Comment periods down in number  Activity originally expected to be much heavier throughout 2013  Seems to be picking up in Q3 ●Several companies have volunteered to “lead” discussions of Ad Hoc Group efforts and Five-Year Review Teams  Luminant, CenterPoint Energy, Oncor, ERCOT, Austin Energy ●Teleconferences reasonably well attended  Continue to be a great way for companies to share views (including those from trade groups) and discuss them from an ERCOT regional-perspective ●Presented at Texas RE Spring Compliance Workshop RSC Meeting June 26, 2013

4 4 NERC Standards Activity – since April 1, 2013 ●5 ballot periods completed covering  7 standards  0 interpretations  1 additional topic (i.e., statutory definitions) ●1 item passed recirculation ballot in Q2  Statutory Definitions; with FERC for approval ●2 items received NERC BoT approval  PRC-024-1 (Generator Frequency and Voltage Protective Relay Settings) and Statutory Definitions ●5 petitions submitted to FERC for approval  Project 2010-INT-01 (TOP-006 Interpretation)  Project 2006-06 (Reliability Coordination, IRO standards)  Project 2007-03 (RT Transmission Operations, TOP standards)  Project 2012-08.1 Phase 1 (Statutory Definitions)  Project 2007-09 (Generator Verification, MOD & PRC standards) RSC Meeting June 26, 2013

5 5 FERC Standards Activity – since April 1, 2013 ●5 NOPRs issued  Project 2010-07 (Generator Req'mts at the Trans Interface)  Project 2008-06 (CIP v5)  Project 2010-11 (TPL-001-4)  Project 2009-19 (Interpretation of BAL-002)  Project 2013-02 (Paragraph 81) ●5 Orders issued  Approving interpretations of TPL-003 &-004 (Proj 2012-INT-02)  Approving EOP-004-2 (Project 2007-07)  Approving VAR-001-3 (WECC variation)  Approving VAR-002-2b (Project 2011-INT-02)  Extending effective date for BES Definition Phase I to July 1, 2014 RSC Meeting June 26, 2013

6 6 NSRS Procedure Revisions ●May 1, 2013 version replaces November 3, 2010 version ●In general, updates align procedure with practice  NSRS provides regular updates to RSC (not findings and recommendations)  There is no voting structure associated with NSRS; it operates on a voluntary, consensus-based model  Chair and Vice Chair are selected by NSRS participants; vacancies filled as needed  NSRS may designate a point of contact for particular projects  Texas RE’s role includes scheduling and facilitating web- meetings  NSRS should strive for diverse participation from all sectors and from large and small companies  Updated Texas RE address ●NSRS will operate under this procedure unless there is an RSC objection RSC Meeting June 26, 2013

7 Lisa Martin Lisa.Martin@austinenergy.com (512) 322-6457 Questions? RSC Meeting June 26, 2013


Download ppt "NSRS Update Recent NERC Standards Activities RSC – June 2013 Presented by: Lisa Martin, NSRS Chair."