Presentation is loading. Please wait.

Presentation is loading. Please wait.

HiRadMat – Users Meeting 29/5/2015 Adrian Fabich EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme,

Similar presentations


Presentation on theme: "HiRadMat – Users Meeting 29/5/2015 Adrian Fabich EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme,"— Presentation transcript:

1 HiRadMat – Users Meeting 29/5/2015 Adrian Fabich EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement 312453

2 HiRadMat beam … GlassyC is installed Waiting for beam … Some pulses on 15. May Now waiting for improvements of SPS extraction 29/5/2015A. Fabich2

3 Feed-throughs Between TNC and TT61 Used already by GlassyC/dBM Inserts - viewing windows arrived at CERN to be installed early June 29/5/2015A. Fabich3 EDMS SPSLHRM_0060

4 TT61 setup TT61 will be equipped with – A standard SPS 19” rack (600 mm x 800 mm) – A table 29/5/2015A. Fabich4

5 Cabling database Document in finalization (EDMS 1415953) Permanent cabling installed – Connecting TNC and TJ7 (patch rack) – Connecting TJ7 and control room Already installed, to be added to DB: – Connecting TNC and TT61 – 5 x NE48 (TT61 connector to be exchanged) – 12 x CK50 29/5/2015A. Fabich5

6 Cabling overview An experimental TNC table is equipped with: From Control Room – 6 x NE48 5 x can be used in manual mode 1 x on automatic plug-in – 24 x CK50 e.g. for BPM read-out – Several HV cables – manual mode, e g. for BPM supply From TT61 – 5 x NE48 from TT61 5 x on automatic plug-in E.g. for strain gauges – 12 x CK50 E.g. for high frequency signals (from BPM) – Dedicated experimental cables (subject to discussion) via empty cable ducts E.g. fibre optics Max diameter 35 mm (also for connectors) Beyond 35 mm requires dedicated study using 3 rd feed-through with inner diameter 100 mm 29/5/2015A. Fabich6

7 Cable proposal forHRMT22 – Ptarg 5 x NE48 from Control Room – 2 x in auto-plug-in mode for horizontal stage Merge to one NE48? – 2 x in manual mode for vertical stage Merge to one NE48? – 1 x in auto-plug-in for LEDs 2 x NE48 from TT61 – auto-plug-in for vacuum gauges/controls 4 x CK50 from TT61 – For BPM No fibres foreseen This is a preliminary list to be completed by the system responsibles. 29/5/2015A. Fabich7

8 Cable proposal for HRMT24 – BeGrid 4 x NE48 from Control Room – 2 x in manual mode for vertical stage – 1 x in auto-plug-in for LEDs – 2 x in manual mode for For BPKG/BTV CK50 from Control Room – For BPKG/BTV 5 x NE48 from TT61 – In auto-plug-in for strain gauges Fibres required? Such a list should be -Prepared by each experiment -Re-iterated with HRM coordination 29/5/2015A. Fabich8

9 Cable proposal for HRMT 27 - RodTarg NE48 ? : 1 x Thermocouple cable 24 pairs, Type K 1 x Thermocouple cable 8 pairs, Type N 1 x NE8 copper cable Special cables – to be discussed: -Should be reduced to a minimum -Space in feed-throughs is limited -Optimizing installation effort 2 x Radiation hard camera cables 3 x Optic fibres respecting the standard G.652 1 x LumaSense Pyrometer Optic fibre: http://www.lumasenseinc.com/uploads/Products/Impac/pdf/Datasheets/Pyromet er/Series_740/IGA740_IGA740_LO_Datasheet.pdf http://www.lumasenseinc.com/uploads/Products/Impac/pdf/Datasheets/Pyromet er/Series_740/IGA740_IGA740_LO_Datasheet.pdf 2 x PANDA PM Optic Fibers 29/5/2015A. Fabich9

10 Schedule 29/5/2015A. Fabich10 Consider 1-2 additional weeks of back-up for beam slot

11 Subsistence for travel/accommodation EuCARD-2 “Transnational Access” 29/5/2015A. Fabich11 Do not hesitate sending requests to hiradmat.ta@cern.chhiradmat.ta@cern.ch More info: https://espace.cern.ch/hiradmat-sps/Wiki%20Pages/HiRadMat@SPS-TA.aspxhttps://espace.cern.ch/hiradmat-sps/Wiki%20Pages/HiRadMat@SPS-TA.aspx

12 Safety file See recommendations by Technical Board – https://edms.cern.ch/project/CERN-0000094595 https://edms.cern.ch/project/CERN-0000094595 Submit response to sps.hiradmat@cern.chsps.hiradmat@cern.ch IN ADVANCE TO BEAM TIME! 29/5/2015A. Fabich12


Download ppt "HiRadMat – Users Meeting 29/5/2015 Adrian Fabich EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme,"

Similar presentations


Ads by Google