Download presentation
Presentation is loading. Please wait.
Published byLizbeth Reeves Modified over 9 years ago
1
Advantages of BIM over Standard Practices 16 th April 2015 Croke Park Conference Centre Colin Conway DIT
2
One model – Many views
3
Insert text here…
4
Families
5
Systems..
6
System Browser
7
Electrical Systems..
8
Schedules
9
Panel Schedules
10
Sizing Calculations
11
Tags
12
View Customisation 1 - Object Styles – Project Wide 2 - Visibility/Graphics Overrides – View Specific
13
Object StylesVisibility/Graphics Overrides
14
3 - Filters View Specific (works in 2D and 3D) A filter is a selection set for visibility control. Categories (e.g. Pipes) can be separated by system (e.g. DHW, DCW, hydronic supply, hydronic return) and each given a different colour.
15
Insert text here…
16
4 - Colour Schemes Used to colour fill object categories Several colours used for each category depending on variable parameters Restricted view types (no 3D) Only available for 7 object categories Area (Gross) Area (Rentable) Rooms Spaces HVAC Zones Ducts Pipes
17
Interference Check
18
Solar Study – Sun Shading Winter SolsticeSummer Solstice
19
Insert text here… Winter Solstice Summer Solstice
20
Solar Paths
21
Insert text here… Spaces…
22
Thank you for listening
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.