Download presentation
Presentation is loading. Please wait.
Published byRandall Atkinson Modified over 9 years ago
1
These statements do not commit Alstom to participation in any specific projects Abcd -SIGNALING IST WORKSHOP Ian Dobson Mainlines Strategy Director
2
2 © ALSTOM 2000These statements do not commit Alstom to participation in any specific projects TRAFFIC MANAGEMENT PASSENGER INFORMATION AUTOMATIC VEHICLE IDENTIFICATION MAINTENANCE ASSISTANCE MARSHALLING YARDS AUTOMATISATION TRAFFIC CONTROL INTERLOCKING TRACK EQUIPMENT fail safe equipment ELECTRIFICATION TELECOMMUNICATIONS Complete Range of Signaling Systems
3
3 © ALSTOM 2000These statements do not commit Alstom to participation in any specific projects Alstom Signaling : Experience in EU projects European Rail Traffic Management System –Standardised Command Control system for high speed lines and subsequently conventional lines –Alstom participated in 4th Framework Programmes for definition and specification of ERTMS ERTMS forms the basis of the railway system solution
4
4 © ALSTOM 2000These statements do not commit Alstom to participation in any specific projects Alstom Signaling : Future trends Using ERTMS as the basis UGTMS : radio based command control for urban transit –adapting ERTMS experience to urban transit needs Low Density Traffic Lines –Low cost safty system using ERTMS elements for very low density lines –Applications both in Europe and outside
5
5 © ALSTOM 2000These statements do not commit Alstom to participation in any specific projects Thank You Information: www.alstom.com ian.dobson@transport.alstom.com
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.