Public Safety Facility and Community Park Background/History Background/History Town of Hinesburg
2
Fire Station
3
Fire Department History Current station built in 1972 with additions in 1976 and 1999, all from fund raising and volunteer labor Current station built in 1972 with additions in 1976 and 1999, all from fund raising and volunteer labor Planning for expanded facility started in 2005 Planning for expanded facility started in 2005 2008 and 2009 plans developed and construction costs estimated. 2008 and 2009 plans developed and construction costs estimated. 2010/2011 plans refined and construction costs updated. 2010/2011 plans refined and construction costs updated.
4
Current Fire Department Area Fire Department currently in 3 areas: Fire Department currently in 3 areas: Fire Station 4,671 sq ft Old Fire Station 346 sq ft Rented Storage 300 sq ft 5,317 sq ft total
5
Need for Additional Fire Department Space Increased Call Volume/Demand for Services Increased Call Volume/Demand for Services Insurance Services Office (ISO) Public Protection Classification (Insurance Rating) Insurance Services Office (ISO) Public Protection Classification (Insurance Rating) Adequate Space for Training- Mutual Aid Adequate Space for Training- Mutual Aid Centralized Location of All Equipment & Apparatus Centralized Location of All Equipment & Apparatus More Energy Efficient Building More Energy Efficient Building EMT Quarters EMT Quarters Long-Term Facilities to Address Current and Future Needs- Adequate space for future apparatus (ladder truck and ambulance) Long-Term Facilities to Address Current and Future Needs- Adequate space for future apparatus (ladder truck and ambulance)
6
Police Department Area Police Department Currently in 2 Areas: Police Department Currently in 2 Areas: Police Station:1,300 sq ft Police Station:1,300 sq ft Old Fire Station 445 sq ft 1,745 sq ft Total 1,745 sq ft Total Note: Cruisers currently stored at Chief’s home
7
Existing Police Station Purchased in 2001 as interim Police Station, value of property recognized as proximity to Fire Station Purchased in 2001 as interim Police Station, value of property recognized as proximity to Fire Station Building consists of original section with 2 subsequent poorly constructed additions with serious foundation/settlement issues. Building consists of original section with 2 subsequent poorly constructed additions with serious foundation/settlement issues. Wet basement with constantly running sump pump. Wet basement with constantly running sump pump. Handicap accessible on first floor only. Handicap accessible on first floor only. Up to 4 officers can be on duty at any given time. Up to 4 officers can be on duty at any given time.
8
Need for Additional Police Department Space Provide Secure Facility (Processing, Detention and Storage) Provide Secure Facility (Processing, Detention and Storage) Centralized Location of All Equipment & Apparatus Centralized Location of All Equipment & Apparatus Adequate Office Space Adequate Office Space Adequate Interview/Conference Area Adequate Interview/Conference Area Long-Term Facilities to Address Current & Future Needs Long-Term Facilities to Address Current & Future Needs Adequate Training/Incident Command Area Adequate Training/Incident Command Area
9
Existing Police Station Uneven and Rolling Floors-First Floor
10
Existing Police Station Floor Settlement-Second Floor
11
Existing Police Station Office Space for up to 4 Officers
12
Existing Police Station Wet Basement with Dirt Floor
13
Existing Police Station Crumbling Foundation and Sill
14
Existing Police Station Second Floor Settlement
15
Existing Police Station Crumbling Garage Foundation
16
Existing Police Station Crumbling Garage Foundation
17
Existing Police Station
18
Lot 1 Committee Formed by Selectboard in 2010 to evaluate uses/designs for Lot 1 (all town owned property around Fire and Police stations) and make recommendation to Selectboard Formed by Selectboard in 2010 to evaluate uses/designs for Lot 1 (all town owned property around Fire and Police stations) and make recommendation to Selectboard Hired Broadleaf as consultants; they developed options reviewed by committee Hired Broadleaf as consultants; they developed options reviewed by committee Selected plan presented at public meeting Jan 2011 Selected plan presented at public meeting Jan 2011 Plan incorporated with proposed building Plan incorporated with proposed building
19
Lot 1 Plan