Presentation is loading. Please wait.

Presentation is loading. Please wait.

PLCS and S1000D Technical Issues. 2 ISE 6 Phase 2 Technical Issues S1000D PLCS DEX –Need to exchange S1000D data modules and relationships to product.

Similar presentations


Presentation on theme: "PLCS and S1000D Technical Issues. 2 ISE 6 Phase 2 Technical Issues S1000D PLCS DEX –Need to exchange S1000D data modules and relationships to product."— Presentation transcript:

1 PLCS and S1000D Technical Issues

2 2 ISE 6 Phase 2 Technical Issues S1000D PLCS DEX –Need to exchange S1000D data modules and relationships to product model –Listed under Business DEX section of plcs-resources But non content defined Linkage between product data and data modules –If design change occurs, need to identify the data modules (TM and training) affected so they can be reviewed and updated.

3 3 Updated Requirements Technical Issue – Linkage DM 1.1 DM 1.2 DM 1.3 Chillers Duct 1 Chiller 2 Duct 2 HVAC Sys Drawing2 DM 2.3 DM 2.2 HVAC Sys IETM 1 HVAC Sys IETM 2 ISEA IDE (Radar) DM 1.1 DM 1.2 Mod 1 Radar IETM Mod 1 DM 1.3 Mod 2 DM 2.1 Mod 2 Radar IETM DM 2.2 Chiller 1 HVAC Sys HVAC Ducts HVAC Sys Drawing1 Shipyard Design & IDE

4 4 Linkage If design change occurs, need to identify the data modules (TM and training) affected so they can be reviewed and updated. –1. Create Ship Alt Identify affected support systems Identify affected components –2. List DM related to affected components –Need mechanism to link a DM to equipment. Can’t always rely on DMC to provide linkage –Data modules may have been authored by vendor or other program –May utilize different business rules (applied at time of creation, not use) Must be relationship – –DMC is generated based on business rules in effect at the time DM was created –Example – pump TM generated for carrier, reused on DDG –Assume dual use DM used to manage training and tech pubs

5 5 EuroSTEP Approach

6 6 Linkage Equipment level TM –PM linked to piece of equipment –TDMIS would related PMC to APL System level TM –PM linked to system –Individual DM linked to equipment/components within system DM where used –Need to derive inverse relationship from PM –LSAR – already maintains relationships

7 7 Questions / Issues Linkage for DMC, PMC to product structure –DDG 1000 linker must identify linkage GIA 0007


Download ppt "PLCS and S1000D Technical Issues. 2 ISE 6 Phase 2 Technical Issues S1000D PLCS DEX –Need to exchange S1000D data modules and relationships to product."

Similar presentations


Ads by Google