Download presentation
Presentation is loading. Please wait.
Published byMegan Dixon Modified over 8 years ago
1
Proposal for Experiment at RCNP Measurement of Proton-Induced Subthreshold Pion Pair Production ( p+A + +X ) Atsushi Sakaguchi (Osaka Univ.)
2
5 August, 2004RCNP B-PAC 2 Physics Motivation L QCD and strong interaction Chiral symmetry is broken dynamically Origin of constituent quark mass Pion as Goldstone boson Gap: QCD and low energy phenomena
3
5 August, 2004RCNP B-PAC 3 How can we prove it to be true ? Phase transition broken conserved High temperature (T>200MeV) High baryon density (>10 0 ) Transient phenomena, dynamical effects Partial restoration of symmetry Precursor of phase transition Nuclei as static environment with finite baryon density (0<< 0 )
4
5 August, 2004RCNP B-PAC 4 Meson productions in nuclei meson (two pions) CHAOS : +A + +X Crystal Ball: +A + +X TAPS : +A + +X // mesons KEK-E325 : p+A e + +e +X Still not clear Drastic effect, elementary proc., absorption
5
5 August, 2004RCNP B-PAC 5 CHAOS Drastic change in channel Spike in M <300 MeV/c 2 Elementary process seems to be not simple (pion induced)
6
5 August, 2004RCNP B-PAC 6 TAPS R Pb/C has spike in M <300 MeV/c 2 Elementary process seems to be simple ( induced)
7
5 August, 2004RCNP B-PAC 7 Proposed Experiment p+A + +X Subthreshold Sensitive to low M component Cross section enhancement Modification of M shape Target mass dependence (future) Subthreshold CERSIUS PRL 88 (2002) 192301
8
5 August, 2004RCNP B-PAC 8 Cross section Simple model calculation Realistic Fermi motion Experimental pp pp cross section Target nucleon binding effect MC calculation 1nb/nucleon (@416MeV) Strong T beam dependence 1.34nb 0.74nb 0.38nb
9
5 August, 2004RCNP B-PAC 9 Existing Setup Ohsho spectrometer at WSS Large acceptance Efficient trigger Improve /p ratio 2.5 orders About 4M /day
10
5 August, 2004RCNP B-PAC 10 Preliminary spectrum Search for like pairs Byproduct of R&D for pnp experiment T Beam =392MeV 8 hours run with Cu target (2.7 h live time) One and another h + Sensitivity down to 0.1nb/nucleon
11
5 August, 2004RCNP B-PAC 11 New Experiment Proposal About 100 times larger yield Establish measurement Present yield is too few Discuss production more clearly M , p and distributions First step to measure A-dependence At least 2 more targets
12
5 August, 2004RCNP B-PAC 12 System Update DAQ Decrease dead time Optimize DAQ sequence VME+FASTBUS Double memory buffer in VME High statistics Beamtime Beam energy 10 (8h80h) 3 (0.4nb1.3nb)
13
5 August, 2004RCNP B-PAC 13 New trigger Two track trigger 2 cluster in Outer hodoscope (available) 2 cluster in CDC hits (need update) Combination of Outer and CDC hits Trigger system w/ ULM (FPGA based)
14
5 August, 2004RCNP B-PAC 14 CDC-Outer trigger Offline analysis results
15
5 August, 2004RCNP B-PAC 15 Requests Beam time Trigger study: 1 day Detector tuning: 1 day Physics run: 4 days Budget ULM: 600,000 yen Cables: 200,000+150,000 yen
16
5 August, 2004RCNP B-PAC 16 Accidental Coincidence Next Bunch Next Bunch 1%1%
17
5 August, 2004RCNP B-PAC 17 opening angle (MC) 70
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.